Installation
Requirements for Modulating Reheat Dehumidification
•
Install (5U108) humidity sensor in space or return duct
•
Complete field wiring of humidity sensor to ECEM (1TB16). Refer to “Field Installed Control
wiring” for guidelines.
Condensate Drain Connections
Each S_HL and S_HK unit is provided with four 1" evaporator condensate drain connections (two
on each side of the unit).
Due to the size of these units, all condensate drain connections must be connected to the
evaporator drain connections. Refer to the appropriate illustration in
location of these drain connections.
A condensate trap must be installed due to the drain connection being on the “negative pressure”
side of the fan. Install the P-Traps at the unit using the guidelines in
Pitch the drain lines at least 1/2 inch for every 10 feet of horizontal run to assure proper condensate
flow. Do not allow the horizontal run to sag causing a possible double-trap condition which could
result in condensate backup due to “air lock”.
Units with Gas Furnace
Units equipped with a gas furnace have a 3/4” CPVC drain connection stubbed out through the
vertical support in the gas heat section. It is extremely important that the condensate be piped to
a proper drain. Refer to the appropriate illustration in
and
for the location of the
drain connection.
Note:
Units equipped with an optional modulating gas furnace will likely operate in a condensing
mode part of the time.
Figure 18. Condensate Drain Locations
Sloped Drain Pan Option
(2) condensate drain openings
both sides
Note:
Connect all sloped drain pan connections on
each side of the unit (total 4) to the trapped
condensate
drain.
Each drain pan connection must be trapped.
The drains may be trapped individually or
connected and then trapped.
Содержание IntelliPak SAHL Series
Страница 47: ...RT SVX36G EN 47 Installation Figure 16 Unit rigging Figure 17 Typical unit base and roof curb cross section...
Страница 65: ...RT SVX36G EN 65 Installation Figure 30 Hot Water Piping 90 130 Ton Figure 31 Steam Coil Piping 20 36 Ton...
Страница 86: ...86 RT SVX36G EN Installation Figure 38 Field connection diagram notes for 20 89 ton CV or VAV applications...
Страница 87: ...RT SVX36G EN 87 Installation Figure 39 Typical field wiring diagram for 20 89 ton VAV control option 2307 9177...
Страница 88: ...88 RT SVX36G EN Installation Figure 40 Typical field wiring diagram for 20 89 ton VAV control option...
Страница 173: ...RT SVX36G EN 173 Startup Checklists Figure 88 Dry bulb changeover map...
Страница 175: ...RT SVX36G EN 175 Maintenance Figure 89 Unit internal fuse replacement data for air handling units...