Warnings, Cautions and Notices
•
If concealed damage is discovered, notify the carrier's terminal of damage immediately by
phone and by mail. Concealed damage must be reported within 15 days.
•
Request an immediate joint inspection of the damage by the carrier and the consignee. Do not
remove damaged material from the receiving location. Take photos of the damage, if possible.
The owner must provide reasonable evidence that the damage did not occur after delivery.
•
Remove the protective plastic coverings that shipped over the compressors.
Storage
Take precautions to prevent condensate from forming inside the unit’s electrical compartments and
motors if:
a. the unit is stored before it is installed; or,
b. the unit is set on the roof curb, and temporary heat is provided in the building. Isolate all side
panel service entrances and base pan openings (e.g., conduit holes, S/A and R/A openings,
and flue openings) from the ambient air until the unit is ready for startup.
Note:
Do not use the unit's heater for temporary heat without first completing the startup
procedure detailed under “Starting the Unit”.
Trane will not assume any responsibility for equipment damage resulting from condensate
accumulation on the unit's electrical and/or mechanical components.
WARNING
No Step Surface!
Do not walk on the sheet metal drain pan. Walking on the drain pan could cause the
supporting metal to collapse, resulting in the operator/technician to fall. Failure to follow this
recommendation could result in death or serious injury.
Содержание IntelliPak SAHL Series
Страница 47: ...RT SVX36G EN 47 Installation Figure 16 Unit rigging Figure 17 Typical unit base and roof curb cross section...
Страница 65: ...RT SVX36G EN 65 Installation Figure 30 Hot Water Piping 90 130 Ton Figure 31 Steam Coil Piping 20 36 Ton...
Страница 86: ...86 RT SVX36G EN Installation Figure 38 Field connection diagram notes for 20 89 ton CV or VAV applications...
Страница 87: ...RT SVX36G EN 87 Installation Figure 39 Typical field wiring diagram for 20 89 ton VAV control option 2307 9177...
Страница 88: ...88 RT SVX36G EN Installation Figure 40 Typical field wiring diagram for 20 89 ton VAV control option...
Страница 173: ...RT SVX36G EN 173 Startup Checklists Figure 88 Dry bulb changeover map...
Страница 175: ...RT SVX36G EN 175 Maintenance Figure 89 Unit internal fuse replacement data for air handling units...