Installation
Requirements for Electric Heat Units
All SEHL Units (380 minimum voltage).
•
Verify that the power supply complies with the electric heater specifications on the unit and
heater nameplate.
•
Inspect the heater junction box and control panel; tighten any loose connections.
•
Check electric heat circuits for continuity.
SEHL Units w/200V or 230V Electric Heat: (Requires Separate Power Supply to
Heater)
•
Connect properly sized and protected power supply wiring for the electric heat from a
dedicated, field- supplied/installed disconnect to terminal block 4TB2, or to an optional unit
mounted disconnect switch 4S15.
Requirements for Gas Heat
•
Gas supply line properly sized and connected to the unit gas train.
•
All gas piping joints properly sealed.
•
Drip leg Installed in the gas piping near the unit.
•
Gas piping leak checked with a soap solution. If piping connections to the unit are complete,
do not pressurize piping in excess of 0.50 psig or 14 inches w.c. to prevent component failure.
•
Main supply gas pressure adequate.
•
Flue Tubes clear of any obstructions.
•
Factory-supplied flue assembly installed on the unit.
•
Connect the 3/4” CPVC furnace drain stubout to a proper condensate drain.
Requirements for Hot Water Heat (SLH_)
•
Route properly sized water piping through the base of the unit into the heating section.
•
Install the factory-supplied, 3-way modulating valve.
•
Complete the valve actuator wiring.
Requirements for Steam Heat (SSH_)
•
Install an automatic air vent at the top of the return water coil header.
•
Route properly sized steam piping through the base of the unit into the heating section.
•
Install the factory-supplied, 2-way modulating valve
•
Complete the valve actuator wiring.
•
Install 1/2”, 15-degree swing-check vacuum breaker(s) at the top of each coil section. Vent
breaker(s) to the atmosphere or merge with return main at discharge side of steam trap.
•
Position the steam trap discharge at least 12" below the outlet connection on the coil.
•
Use float and thermostatic traps in the system, as required by the application.
O/A Pressure Sensor and Tubing Installation (All units with Statitrac or Return Fans)
•
O/A pressure sensor mounted to the roof bracket.
•
Factory supplied pneumatic tubing installed between the O/A pressure sensor and the
connector on the vertical support.
•
Field supplied pneumatic tubing connected to the proper fitting on the space pressure
transducer located in the filter section, and the other end routed to a suitable sensing location
within the controlled space (Statitrac only).
Содержание IntelliPak SAHL Series
Страница 47: ...RT SVX36G EN 47 Installation Figure 16 Unit rigging Figure 17 Typical unit base and roof curb cross section...
Страница 65: ...RT SVX36G EN 65 Installation Figure 30 Hot Water Piping 90 130 Ton Figure 31 Steam Coil Piping 20 36 Ton...
Страница 86: ...86 RT SVX36G EN Installation Figure 38 Field connection diagram notes for 20 89 ton CV or VAV applications...
Страница 87: ...RT SVX36G EN 87 Installation Figure 39 Typical field wiring diagram for 20 89 ton VAV control option 2307 9177...
Страница 88: ...88 RT SVX36G EN Installation Figure 40 Typical field wiring diagram for 20 89 ton VAV control option...
Страница 173: ...RT SVX36G EN 173 Startup Checklists Figure 88 Dry bulb changeover map...
Страница 175: ...RT SVX36G EN 175 Maintenance Figure 89 Unit internal fuse replacement data for air handling units...