62
RT-SVX063E-EN
Trane Startup Checklist
This checklist is intended to be a guide for the Trane
technician just prior to unit 'startup'. Many of the
recommended checks and actions could expose the
technician to electrical and mechanical hazards. Refer
to the appropriate sections in the this manual for
appropriate procedures, component specifications and
safety instructions.
IIm
mp
po
orrtta
an
ntt:: This checklist is not intended as a
substitution for the contractor’s installation
instruction.
IIm
mp
po
orrtta
an
ntt:: Except where noted, it is implied that the
Trane technician is to use this checklist for
inspection/verification of prior tasks
completed by the general contractor at
installation. Use the line item content to
also record the associated values onto the
Trane unitary packaged equipment log.
J
Jo
ob
b N
Na
am
me
e
S
Se
erriia
all #
#
J
Jo
ob
b L
Lo
occa
attiio
on
n
M
Mo
od
de
ell #
#
S
Sa
alle
ess O
Orrd
de
err #
#
S
Sh
hiip
p D
Da
atte
e
U
Un
niitt D
DL
L #
# ((ssp
pe
ecciia
all u
un
niittss))
D
Da
atte
e
S
Stta
arrttiin
ng
g S
Sa
alle
ess O
Offffiicce
e
T
Te
ecch
hn
niicciia
an
n
Table 26.
Startup checklist
Completed?
General Start-up
1
Is adequate access/egress provided?
Yes
No
2
Initial site inspection performed?
Yes
No
3
Unit exterior inspected for damage (dents, bends, missing panels, doors work properly)?
Yes
No
4
Unit clearances adequate to avoid air recirculation?
Yes
No
5
Verify crankcase heaters are working and on for 8 hours prior to unit start
Yes
No
6
Verify unit interior is free from debris and obstructions, etc.
Yes
No
7
All unit drain lines and traps are properly installed
Yes
No
8
Verify unit is grounded. Confirm a ground wire is coming from the power source
Yes
No
9
Verify main power feed wire gauge is properly sized for current load
Yes
No
10
Verify all wiring connections are tight
Yes
No
11
Verify all field control wiring for CV, SZVAV or VAV controls are complete
Yes
No
12
Verify hold down bolts from fan sections removed
Yes
No
13
Fan section isolators checked/adjusted (approximately ¼” gap above shipping block)
Yes
No
14
Verify compressor oil levels at proper levels
Yes
No
15
Compressor discharge service valves and optional suction service valves open/back seated
Yes
No
16
Verify fans rotate freely
Yes
No
17
Verify refrigerant charge on each circuit
Yes
No
18
Verify correct voltage supplied to unit and electrical heaters
Yes
No
19
Verify there are no unit phase monitor errors.
Yes
No
20
Verify all fans rotate in proper direction
Yes
No
21
Verify fan amperages within nameplate specs (please document on log sheet)
Yes
No
Unit Configuration and Setup
1
Verify model number in the UCM configuration matches unit model number on nameplate
Yes
No
2
Configure unit using IOM and critical control parameters using critical control parameters table
Yes
No
Air Cooled Condenser
1
All coil fins inspected and straightened
Yes
No
2
Condenser fans are rotating freely
Yes
No
3
Verify the fan blade set-screws to the motor shaft of the condenser fan assemblies are tight
Yes
No
Outside Air and Economizer (if applicable)
1
Verify damper linkages are tight/adjusted and tip seals are in good condition
Yes
No
2
Outside air pressure sensor installed and tubing connected to fitting on unit exterior
Yes
No
3
Duct pressure tubing connected to duct pressure sensor
Yes
No
4
Tubing from controlled space connected to space pressure fitting (StatiTrac)
Yes
No
S
Stta
arrttu
up
p tth
he
e U
Un
niitt