background image

 

 

Installation

 

 

 

 

 

 

CAUTION: The installation must be 
conducted by a qualified technician.

 

 

Receiving And Handling

 

Trane HFCF Fan Coil units are packaged in 
individual cartons for maximum protection 
during shipment, as well as for easy handling 
and storage on the job site. 

 

To protect against loss from in-transit damage, 
complete the following upon receipt of the units: 

 

1. Inspect individual pieces of the shipment 

before accepting it. Check for rattles, bent 
corners on cartons or other visible 
indications of shipping damage. 

2. If a carton has apparent damage, open it 

immediately and inspect the contents 
before accepting the unit. Do not refuse the 
shipment. Make specific notations 
concerning the damage on the freight bill. 
Check the unit casing, fan rotation, coils, 
drain pan, filters and all options. 

3. Inspect the unit for concealed damage 

before it is stored and as soon as possible 
after delivery. 

4. Do not remove damaged material from the 

receiving location if possible. It is the 
receiver's responsibility to provide 
reasonable evidence that concealed 
damage was not incurred after delivery. 

5. If concealed damage is discovered, stop 

unpacking the shipment. Retain all internal 
packing and cartons. Take photos of the 
damaged material if possible. 

6. Notify the carrier's terminal of damage 

immediately by phone and mail if any 
damage is found. Request an immediate 
joint inspection of the damage by the 
carrier and consignee. 

7. Notify the Trane sales representative of 

the damage and arrange for repair. Do not 
repair the unit yourself, however, until 
damage is inspected by the carrier's 
representative. 

 

 

 

 

 

 

 

 

 

 

Installation Considerations

 

For proper installation and operation, check 
each of the following before mounting the 
units: 

 

1. Allow adequate space for the unit and free 

air or service clearances reference Figure 2. 
See Figures4, 5 and 6 for general unit 
dimensions. For servicing and routine 
maintenance, provide access to the unit 
through removable panels in the ceiling. 

2. Before installing any unit make sure proper 

preparation has been made at each unit 
location for piping and electrical 
connections. 

3. Check that the supporting structure is 

strong enough to support unit weights, as 
given on Figures4, 5 and 6. 

4. All units must be mounted LEVEL to 

assure proper drainage and operation. 

5. Ducting connected to units (where 

applicable) should not exceed the external 
static pressure rating of the unit. 

6. Condensate protection for the chilled water 

valves and piping must be provided by 
installer. A drain pan extension provided by 
installer should be located under the valves 
or else the valves and piping should be 
thoroughly insulated. 

7. Units with valve package are equipped 

with long drain pan which can carry the 
condensation from water valves. 
Insulation of valve package is not required. 

 

Mounting

 

The Trane model HFCF units are designed to 
be suspended from the ceiling on 3/8-16 
threaded rods furnished by the installer. Holes 
are provided at the top of the unit, see Figures 
4, 5 and 6 for cutout dimensions and locations. 

 

To install the Trane model HFCF, complete 
the following: 

 

 

 

 

 

 

 

 

 

 

 

1. Install the suspension rods or other 

suspension  devices which  must  be 
provided by the installer. 

2. Put the upper W3/8 nuts and W3/8 lock 

washers on suspension rods to prevent 
unit from upward tilting during unit 
operation or duct installation, as shown on 
Figure 2 Typical Installation. 

3. Hoist the unit into position. See Figures 4, 5 

and 6 for unit weights. 

4. Put on the lower W3/8 lock washers and 

then W3/8 nuts to secure the unit, as 
shown on Figure 2 Typical Installation. 

5. Level the unit casing to avoid poor 

condensate drainage by adjusting lower 
nuts up/down, and then tighten the upper 
nuts. 

 

Note: Level the unit by checking on the 
unit casing. Do not use the coil or drain 
pan for leveling as they are pitched to 
provide proper drainage.

 

 

Duct Connections

 

Minimum 24 gauge galvanized sheet metal 
duct (supplied by the installer) can be 
attached to duct collars provided at the unit 
air outlet and inlet, see Figures 4, 5 and 6 
for duct collar dimensions. To attach, slip the 
duct over the outlet collar and fasten the 
duct and collar together with screws. Filed- 
supplied transition fittings should be used in 
installations where unit duct collars do not 
match discharge air-grille collars. 

 

One approaches can be used to attach an 
Air Supply Chamber and flexible ducts. 

 

The approach is to slip the duct over the unit 
outlet collar and then fasten the duct and 
collar together with screws or rivets, as 
shown on Figure 3 Duct Work - A. 

A return duct can be attached to the return 
air collar provided at the unit. To attach, slip 
the return duct over the return air collar and 
fasten the duct and collar together with 
screws. 

 

 

HFCF-SVX01A-EN 

Содержание HFCF-SVX01A-EN

Страница 1: ...Installation Operation Maintenance Chilled Water Fan Coil Unit Airflow 200 1400CFM HFCF SVX01A EN...

Страница 2: ...ections Figure 2 Typical Installation Figure 3 Duct Work Dimension Data and Weights 9 Figure 4 HFCF Without Reture Plenum Figure 5 HFCF With Bottom Return Plenum Figure 6 HFCF With Rear Return Plenum...

Страница 3: ...e motor The motor lead out wires are enclosed by flexible metal conduit and providing protection against damage Coil The coil can have 2 3 or 4 rows with copper tubes mechanically bonded into slit alu...

Страница 4: ...tor Type N Normal H High Static A DCBL Normal w LCD thermostat B DCBL High Static w LCD thermostat C Hermetic Motor Normal Type D Hermetic Motor High Static Type Digit 11 Voltage Hz Phase 1 220 50 1 2...

Страница 5: ...mm Non flammable Close Cell Insulation Extended 310mm N STD Galvanized Steel w 10mm Non flammable Close Cell Insulation P STD Galvanized Steel w 10mm Non flammable Close Cell Insulation Extended 200mm...

Страница 6: ...drainage and operation 5 Ducting connected to units where applicable should not exceed the external static pressure rating of the unit 6 Condensate protection for the chilled water valves and piping m...

Страница 7: ...wiring diagram decals on each unit Also see Figure 7 for wiring diagrams A grounding point which must be properly connected to the building grounding system has been provided with a mark on the verti...

Страница 8: ...Dimension Data and Weights Figure 2 Typical Installation Figure 3 Duct Work 8...

Страница 9: ...3 1820 1983 1882 2 4 37 40 43 38 41 44 45 48 51 46 51 52 6 111 10 145 24 270 14 211 12 43 A B C 29 11 18 14 View A 543 520 248 248 198 D Outlet water Collar 3 4 inch female pipe thread FPT Inlet water...

Страница 10: ...Wiring Diagram Figure 7 Model HFCF Wiring Diagrams 10...

Страница 11: ...prepared for weight leveling and service access Unit is mounted securely to the ceiling support rods Ductwork connections are complete Coil connections are complete and tight Condensate drain pan con...

Страница 12: ...tout 85 auto reset is provided to de energize electric heat in the event of an overheat condition In addition to the automatic reset cutout the unit also equipped with another high temperature cutout...

Страница 13: ...Figure 8 Fan Board Assembly Maintenance...

Страница 14: ...source To clean permanent filters remove the filter media and wash it in water to remove dust dirt and lint allow to dry thoroughly before re installing in the unit Change Entire Fan Board The entire...

Страница 15: ...oling capacity Followings are the cleaning steps 1 Disconnect the power and motor wire and stop the fan 2 Remove the whole fan seat and clean from the air inlet 3 Clean the coil fin using rigid nylon...

Страница 16: ...e office or e mail us at comfort trane com Literature Order Number Date Supersedes HFCF SVX01A EN March 2008 New Trane has a policy of continuous product and product data improvement and reserves the...

Отзывы: