22
RT-SVX51L-EN
Figure 23.
TCO1 limit ship-with location
Figure 24.
TCO1 limit factory-installed location
17. Once the conversion is complete, scratch off the ink
square (to the right-hand side). SCRATCH INK OFF
SQUARE WHEN USING SUPPLEMENTAL HEATING
DATA on both English and French nameplate.
18. Paste the ship-with supplemental heating data label
over the existing heating data on both English and
French nameplate. See Figure 25.
Содержание Foundation GCC180-300
Страница 30: ...30 RT SVX51L EN Figure 31 Through the base gas piping installation Installation...
Страница 42: ...42 RT SVX51L EN Table 18 Unit data log continued schematic s connections Network ID Maintenance...
Страница 49: ...RT SVX51L EN 49 Notes...
Страница 50: ...50 RT SVX51L EN Notes...
Страница 51: ...RT SVX51L EN 51 Notes...