26
RT-SVX069D-EN
High Pressure Cutout and Temperature
Discharge Limit
The high pressure controls and temperature discharge limit
are wired in series between the compressor outputs on the
LTB and the compressor contactors. If the high pressure
safety or temperature discharge limit opens, the
compressor on the affected circuit is turned off.
Heating Operation
Standard unit operation for heating will continue on units
equipped with a two-speed indoor fan. During heat mode,
all units configured with staged electric or gas heat will heat
the supply air and space as normal utilizing full speed
indoor fan.
Emergency Stop
This input de-energizes the 24 Vac output from the phase
monitor and can be activated by opening a field supplied
device.
Compressor Start-Up
1. Attach a set of service gauges onto the suction and
discharge gauge ports for each circuit.
See,
for startup instructions.
Scroll Compressors
a. Once each compressor has started, verify that the
rotation is correct. If wired correctly the suction
pressure should drop and the discharge pressure
should rise. If a scroll compressor is rotating
backwards, it will not pump and a loud rattling
sound can be observed.
b. Once each compressor has started, verify that the
rotation is correct. If wired correctly the suction
pressure should drop and the discharge pressure
should rise. If a scroll compressor is rotating
backwards, it will not pump and a loud rattling
sound can be observed.
Figure 15.
Compressor terminal box
Compressor ZP**
3
2
1
Compressor ABG/M0**
3
2
1
IP22
1. Spade connectors 1/4–in.
2. Earth connection
3. Power cable passage
T1
T2
T3
Table 9.
Compressor types
Tonnage
208/230V
460V
Compres-
sor 1
Compres-
sor 2
Compres-
sor 1
Compres-
sor 2
E/GC*090
ABG042R
ZP31-TF5
ABG042W
ZP31-TFD
E/GC*102
ABM051R
ABG42R
ABM051W
ZP31-TFD
E/GC*120
ABM051R
ZP51-TF5
ABM051W
ZP51-TFD
E/GC*150
ZP72-TF5
ABM051R
ZP72-TFD
ABM051W
Table 10.
POE Oil recharge amount (fl. oz.)
Tonnage
208/230V
460V
Compres-
sor 1
Compres-
sor 2
Compres-
sor 1
Compres-
sor 2
E/GC*090
43
25
43
25
E/GC*102
43
43
43
43
E/GC*120
43
42
43
42
E/GC*150
60
43
60
43
2. After the compressor and condenser fan have started
and operated for approximately 30 minutes, observe
the operating pressures. Compare the operating
pressures to the operating pressure curve..
3. Check system subcooling.
4. Repeat Step 1 through Step 3 for each refrigerant
circuit.
Содержание Foundation GCC 090-150
Страница 5: ...RT SVX069D EN 5 Exclusions and Limitations 37 Table of Contents ...
Страница 38: ...38 RT SVX069D EN Notes ...
Страница 39: ...RT SVX069D EN 39 Notes ...