background image

18

RT-SVX51H-EN

Installation

Unit Foundation

W

WA

AR

RN

NIIN

NG

G

R

Riisskk o

off R

Ro

oo

off C

Co

olllla

ap

pssiin

ng

g!!

F

Fa

aiillu

urre

e tto

o e

en

nssu

urre

e p

prro

op

pe

err ssttrru

uccttu

urra

all rro

oo

off ssu

up

pp

po

orrtt

cco

ou

ulld

d cca

au

usse

e tth

he

e rro

oo

off tto

o cco

olllla

ap

psse

e,, w

wh

hiicch

h cco

ou

ulld

d

rre

essu

ulltt iin

n d

de

ea

atth

h o

orr sse

erriio

ou

uss iin

njju

urry

y a

an

nd

d p

prro

op

pe

errtty

y

d

da

am

ma

ag

ge

e..

C

Co

on

nffiirrm

m w

wiitth

h a

a ssttrru

uccttu

urra

all e

en

ng

giin

ne

ee

err tth

ha

att tth

he

e rro

oo

off

ssttrru

uccttu

urre

e iiss ssttrro

on

ng

g e

en

no

ou

ug

gh

h tto

o ssu

up

pp

po

orrtt tth

he

e

cco

om

mb

biin

ne

ed

d w

we

eiig

gh

htt o

off tth

he

e rro

oo

offccu

urrb

b,, tth

he

e u

un

niitt,, a

an

nd

d a

an

ny

y

a

acccce

esssso

orriie

ess..

N

NO

OT

TIIC

CE

E

W

Wa

atte

err D

Da

am

ma

ag

ge

e!!

F

Fa

aiillu

urre

e tto

o ffo

ollllo

ow

w iin

nssttrru

uccttiio

on

nss b

be

ello

ow

w cco

ou

ulld

d rre

essu

ulltt iin

n

e

eq

qu

uiip

pm

me

en

ntt a

an

nd

d p

prro

op

pe

errtty

y d

da

am

ma

ag

ge

e..

N

No

on

n--ffa

acctto

orry

y p

pe

en

ne

ettrra

attiio

on

nss tth

hrro

ou

ug

gh

h tth

he

e b

ba

asse

e o

off tth

hiiss

u

un

niitt a

arre

e n

no

ott a

allllo

ow

we

ed

d.. A

An

ny

y p

pe

en

ne

ettrra

attiio

on

n iin

n tth

he

e b

ba

asse

e

o

off tth

he

e u

un

niitt m

ma

ay

y a

affffe

ecctt tth

he

e w

wa

atte

err ttiig

gh

htt iin

ntte

eg

grriitty

y o

off

tth

he

e u

un

niitt a

an

nd

d lle

ea

ad

d tto

o w

wa

atte

err lle

ea

akkss iin

ntto

o tth

he

e

cco

on

nd

diittiio

on

ne

ed

d ssp

pa

acce

e..

N

NO

OT

TIIC

CE

E

R

Ro

oo

off D

Da

am

ma

ag

ge

e!!

S

Sy

ysstte

em

m cco

on

ntta

aiin

nss o

oiill a

an

nd

d rre

effrriig

ge

erra

an

ntt u

un

nd

de

err h

hiig

gh

h

p

prre

essssu

urre

e.. R

Ro

oo

offss ssh

ho

ou

ulld

d b

be

e p

prro

otte

ecctte

ed

d ffrro

om

m

e

ex

xp

po

ossu

urre

e tto

o o

oiillss a

an

nd

d rre

effrriig

ge

erra

an

ntt iin

n tth

he

e ssy

ysstte

em

m.. IIff

rro

oo

offtto

op

p iiss n

no

ott p

prro

otte

ecctte

ed

d,, d

da

am

ma

ag

ge

e tto

o tth

he

e rro

oo

off m

ma

ay

y

o

occccu

urr..

IIm

mp

po

orrtta

an

ntt:: Refer to local building codes for proper

installation. All installation must comply
with local building codes.

Horizontal Units

N

No

otte

ess::

For complete step by step instructions on
how to install a Horizontal Conversion Kit,
please refer to ACCSVN159*- EN.

For units with optional Condensate
Overflow Switch (COF) , the switch will not
work properly if unit is not level or slightly
sloped toward switch.

To assure proper condensate flow during
operation the unit and the curb must be
level.

If the unit is installed at ground level, elevate it above
the snow line. Provide concrete footings at each
support location with a “full perimeter” support
structure or a slab foundation for support. Refer to

Table 1, p. 16

for the unit’s operating and point loading

weights when constructing a footing foundation.

If anchoring is required, anchor the unit to the slab
using hold down bolts or isolators. Isolators should be
installed to minimize the transmission of vibrations
into the building.

For rooftop applications, if anchoring is required,
anchor the unit to the roof with hold-down bolts or
isolators.

Check with a roofing contractor for proper
waterproofing procedures.

Ductwork

Elbows with turning vanes or splitters are
recommended to minimize air noise due to turbulence
and to reduce static pressure.

When attaching the ductwork to the unit, provide a
watertight flexible connector at the unit to prevent
operating sounds from transmitting through the
ductwork.

All outdoor ductwork between the unit and the
structure should be weather proofed after installation is
completed.

N

No

otte

e:: For sound consideration, cut only the holes in the

roof deck for the ductwork penetrations. Do not
cut out the entire roof deck within the curb
perimeter.

If a Curb Accessory Kit is not used:

1. The ductwork can be attached directly to the

factory-provided flanges around the unit’s supply
and return air openings. Be sure to use flexible duct
connections at the unit.

2. For “built-up” curbs supplied by others, gaskets

must be installed around the curb perimeter flange
and the supply and return air opening flanges.

General Unit Requirements

W

WA

AR

RN

NIIN

NG

G

P

Prro

op

pe

err F

Fiie

elld

d W

Wiirriin

ng

g a

an

nd

d G

Grro

ou

un

nd

diin

ng

g

R

Re

eq

qu

uiirre

ed

d!!

F

Fa

aiillu

urre

e tto

o ffo

ollllo

ow

w cco

od

de

e cco

ou

ulld

d rre

essu

ulltt iin

n d

de

ea

atth

h o

orr

sse

erriio

ou

uss iin

njju

urry

y..

A

Allll ffiie

elld

d w

wiirriin

ng

g M

MU

US

ST

T b

be

e p

pe

errffo

orrm

me

ed

d b

by

y q

qu

ua

alliiffiie

ed

d

p

pe

errsso

on

nn

ne

ell.. IIm

mp

prro

op

pe

errlly

y iin

nsstta

alllle

ed

d a

an

nd

d g

grro

ou

un

nd

de

ed

d

ffiie

elld

d w

wiirriin

ng

g p

po

osse

ess F

FIIR

RE

E a

an

nd

d E

EL

LE

EC

CT

TR

RO

OC

CU

UT

TIIO

ON

N

h

ha

azza

arrd

dss.. T

To

o a

av

vo

oiid

d tth

he

esse

e h

ha

azza

arrd

dss,, y

yo

ou

u M

MU

US

ST

T ffo

ollllo

ow

w

rre

eq

qu

uiirre

em

me

en

nttss ffo

orr ffiie

elld

d w

wiirriin

ng

g iin

nsstta

alllla

attiio

on

n a

an

nd

d

g

grro

ou

un

nd

diin

ng

g a

ass d

de

essccrriib

be

ed

d iin

n N

NE

EC

C a

an

nd

d y

yo

ou

urr llo

occa

all//

sstta

atte

e//n

na

attiio

on

na

all e

elle

eccttrriicca

all cco

od

de

ess..

The checklist listed below is a summary of the steps
required to successfully install a commercial unit. This
checklist is intended to acquaint the installing
personnel with what is required in the installation

Содержание Foundation GBC180

Страница 1: ...ng Improperly installed adjusted or altered equipment by an unqualified person could result in death or serious injury When working on the equipment observe all precautions in the literature and on th...

Страница 2: ...r p pr ro op pe er r P PP PE E f fo or r t th he e j jo ob b b be ei in ng g u un nd de er rt ta ak ke en n c co ou ul ld d r re es su ul lt t i in n d de ea at th h o or r s se er ri io ou us s i in...

Страница 3: ...ma ay y a af ff fe ec ct t t th he e w wa at te er r t ti ig gh ht t i in nt te eg gr ri it ty y o of f t th he e u un ni it t a an nd d l le ea ad d t to o w wa at te er r l le ea ak ks s i in nt to...

Страница 4: ...y Mounted Unit Options 26 Unit Disconnect FIYUDC 26 Through the Base Gas Utility Option 27 Field Installed Connections 27 Pre Start 29 Verifying Proper Air Flow Units with Belt Drive Indoor Fan 29 Ele...

Страница 5: ...t Up 39 Maintenance 40 Fan Belt Adjustment Belt Drive Units 40 Monthly Maintenance 41 Filters 41 Condensate Overflow Switch 41 Cooling Season 41 Heating Season 42 Coil Cleaning 42 Troubleshooting 45 S...

Страница 6: ...Barometric Relief L Downflow Low Leak Economizer Reference Enthalpy w o Barometric Relief N Downflow Low Leak Economizer Comparative Enthalpy w o Barometric Relief Digit 15 Supply Fan Drive Type Motor...

Страница 7: ...tr ra at ti io on ns s r re eq qu ui ir ri in ng g a ad dd di it ti io on na al l r re es sp pi ir ra at to or ry y p pr ro ot te ec ct ti io on n U Us se e t th he e a ap pp pr ro op pr ri ia at te...

Страница 8: ...relay energizes and opens the 24 Vac control circuit disabling the unit A delay timer prevents the unit from starting for 3 minutes Phase Monitor The Phase Monitor is a three phase line monitor module...

Страница 9: ...he CO2 SPAN to 1600 ppm in the ADVANCED SETUP menu Occupancy Sensor A customer supplied occupancy sensor can also be added to provide damper control based on occupied unoccupied conditions Low Leak Ec...

Страница 10: ...zer airflows or recirculation of hot condenser air Figure 1 Typical installation clearance for single and multiple unit applications NOTES 1 FOR HORIZONTAL DISCHARGE UNIT THIS MEASUREMENT IS REDUCED T...

Страница 11: ...ON G C UNIT ONLY CONDENSATE DRAIN CONNECTION Figure 3 Cooling with optional electrical heat front and side views gas electric NOTES 1 THROUGH THE BASE GAS AND ELECTRICAL IS NOT STANDARD ON ALL UNITS 2...

Страница 12: ...IMENSION WITH INSTALLER DOCUMENTS BEFORE INSTALLATION THROUGH THE BASE ELECTRICAL RETURN SUPPLY 7 3 8 123 1 8 THRU THE BASE GAS G C UNIT ONLY 36 1 16 6 15 16 6 13 16 68 9 16 7 7 16 14 15 16 71 15 16 6...

Страница 13: ...51 MM 69 1 2 1765 MM Figure 7 Cooling with optional electrical heat downflow duct connections field fabricated 1 25 4 MM CURB FLANGE LONG SIDES 14 1 16 357 MM 7 7 16 189 MM 73 7 16 1865 MM 1 25 MM 19...

Страница 14: ...nal electric heat barometric relief and economizer NOTES 1 VERIFY WEIGHT CONNECTION AND ALL DIMENSION WITH INSTALLER DOCUMENTS BEFORE INSTALLATION 2 BAROMETRIC RELIEF IS FOR USE WITH A DOWNFLOW ECONOM...

Страница 15: ...manual damper NOTE VERIFY WEIGHT CONNECTION AND ALL DIMENSION WITH INSTALLER DOCUMENTS BEFORE INSTALLATION BACK VIEW OF UNIT LEFT VIEW OF UNIT FAN MANUAL DAMPER HOOD 123 1 8 18 1 4 26 7 8 24 7 8 12 1...

Страница 16: ...a as s n ne ec ce es ss sa ar ry y f fo or r e ev ve en n u un ni it t l li if ft t W WA AR RN NI IN NG G I Im mp pr ro op pe er r U Un ni it t L Li if ft t F Fa ai il lu ur re e t to o p pr ro op pe...

Страница 17: ...RT SVX51H EN 17 Figure 12 Rigging and center of gravity data CENTER OF GRAVITY LENGTH CENTER OF GRAVITY WIDTH W We ei ig gh ht ts s...

Страница 18: ...tion the unit and the curb must be level If the unit is installed at ground level elevate it above the snow line Provide concrete footings at each support location with a full perimeter support struct...

Страница 19: ...o the main power terminal block HTB1 in the unit control panel Install proper grounding wires to an earth ground N No ot te e All field installed wiring must comply with NEC and applicable local codes...

Страница 20: ...ration with the TCO1 from Step 2 for horizontal operation 4 Reinstall the heat section access panel Figure 17 Factory installed down flow TCO1 limit location Condensate Drain Configuration An evaporat...

Страница 21: ...or r s se er ri io ou us s i in nj ju ur ry y A Al ll l f fi ie el ld d w wi ir ri in ng g M MU US ST T b be e p pe er rf fo or rm me ed d b by y q qu ua al li if fi ie ed d p pe er rs so on nn ne el...

Страница 22: ...g ge e a as s t th he e e eq qu ui ip pm me en nt t w wa as s n no ot t d de es si ig gn ne ed d o or r q qu ua al li if fi ie ed d t to o a ac cc ce ep pt t o ot th he er r t ty yp pe es s o of f c c...

Страница 23: ...14 inch W C to prevent component failure Drip leg installed in the gas piping near the unit Flue Exhaust clear of any obstruction Gas Heat Data Table 3 Gas heater operating data Heating Input Rate Btu...

Страница 24: ...have a positive pressure gas valve Never adjust the staged gas pressure valve to a negative pressure b A voltage reading across pens V and V is equatable to the flame sensing current One volt equals o...

Страница 25: ...nnected for the proper rotation when the incoming power supply is phased as A B C Proper electrical supply phasing can be quickly determined and corrected before starting the unit by using an instrume...

Страница 26: ...Use the following checklist in conjunction with the general checklist General Unit Requirements p 18 to ensure that the unit is properly installed and ready for operation W WA AR RN NI IN NG G H Ha a...

Страница 27: ...ect the ground wire to the unit ground lug N No ot te e Wire size for the length of run should be determined using the circuit ampacity found on the unit nameplate and the N E C 4 Route low voltage cl...

Страница 28: ...yo ou ur r l lo oc ca al l s st ta at te e n na at ti io on na al l e el le ec ct tr ri ic ca al l c co od de es s I Im mp po or rt ta an nt t All phases of this installation must comply with NATIONAL...

Страница 29: ...ol ECA if applicable Electromechanical Controls Test Procedure See unit schematic for correct wire numbers F Fa an n T Te es st t a an nd d M Mi in ni im mu um m V Ve en nt ti il la at ti io on n Conn...

Страница 30: ...tion Evaporator Fan Operation for Cooling Only Units Standard Economizer When the thermostat fan selection switch is set to the Auto position the thermostat energizes the indoor fan relay coil F to st...

Страница 31: ...or blower delay off at current speed The IGN de energizes the inducer blower at the end of the post purge The IGN de energizes the indoor blower at the end of the selected indoor blower delay off Tabl...

Страница 32: ...d the potential for more fresh air than desired at higher fan speeds These minimum positions will be obtained from the Bldg Design Min Position and DCV Min Position pots on the RTEM EM The economizer...

Страница 33: ...0 v Off VENTMIN Closed On Off High 0 v Off 0 v Off VENTMIN to Full Open Closed to Full Open On On High 24 v On 0 v Off a VENTMIN to Full Open Closed to Full Open Above CO2 set No Off Off High 0 v Off...

Страница 34: ...LY in Advanced setup menu can turn on 2nd stage of mechanical cooling Y2 O after the delay if the call for Y1 I and Y2 I have not been satisfied Table 14 Dry bulb operation no DCV CO2 sensor 2 speed f...

Страница 35: ...satisfied b With 2SP FAN DELAY Advanced Setup Menu when in the economizing mode there is a delay for the high speed fan to try to satisfy the call for second stage cooling by turning on the fan to hi...

Страница 36: ...alpy boundaries parameters ES1 through ES5 Enth Curve Temp dry Bulb F Temp dewpoint F Enthalpy btu lb da Point P1 Point P2 Temp F Humid RH Temp F Humid RH ES1 80 0 60 0 28 0 80 0 36 8 66 3 80 1 ES2 75...

Страница 37: ...r temperature discharge limit opens the compressor on the affected circuit is turned off Coil Frost Protection The Frostat control monitors the evaporator coil temperature to prevent the evaporator fr...

Страница 38: ...e should drop and the discharge pressure should rise If a scroll compressor is rotating backwards it will not pump and a loud rattling sound can be observed b If the electrical phasing is correct befo...

Страница 39: ...ation Refer to the programming instructions for the specific panel Verify that the Remote panel System selection switch Fan selection switch and Zone Temperature settings for automatic operation are c...

Страница 40: ...w belts do not stretch them over the sheaves Loosen the belts using the belt tension adjustment bolts on the motor mounting base Once the new belts are installed using a Browning or Gates tension gaug...

Страница 41: ...er ri io ou us s i in nj ju ur ry y D Di is sc co on nn ne ec ct t a al ll l e el le ec ct tr ri ic c p po ow we er r i in nc cl lu ud di in ng g r re em mo ot te e d di is sc co on nn ne ec ct ts s...

Страница 42: ...ch circuit superheat and subcooling each circuit Record this data on an operator s maintenance log like the one shown in Sample maintenance log table in Final Process Section If the operating pressure...

Страница 43: ...thin walls of the MCHE coils the traditional field maintenance method recommended for Round Tube Plate Fin RTPF coils does not apply to microchannel coils Moreover chemical cleaners are a risk factor...

Страница 44: ...id Press Psig kPa Super heat F C Sub cool F C Compr Oil Level Suct Press Psig kPa Disch Press Psig kPa Liquid Press Psig kPa Super heat F C Sub cool F C ok low ok low ok low ok low ok low ok low ok lo...

Страница 45: ...check the Ignition Module IGN To prevent injury or death from electrocution it is the responsibility of the technician to recognize this hazard and use extreme care when performing service procedures...

Страница 46: ...d to see if it is causing the fault to occur Table 25 FDD troubleshooting FAULTS TESTS Air temp sensor failure fault Not economizing when it should Economizing when it should not Damper not modulating...

Страница 47: ...sh 1 30 Second On 1 4 Second Off 2 Seconds between pulse sequences Error Code 1 Flash Actuator Fault 2 Flashes CO2 Sensor 3 Flashes RA Humidity Sensor 4 Flashes RA Temp Sensor 6 Flashes OA Humidity Se...

Страница 48: ...r Description Constant Volume Power 208 230 1213 3650 Schematic PWR EM CO Gas Heat CV 460 575 1213 3651 Schematic PWR EM Gas Heat CV Control 208 575 1213 2969 GBC180 300 GBD180 300 60Hz 2 Stage Gas He...

Страница 49: ...r s obligations and liabilities under this warranty are limited to furnishing F O B factory or warehouse at the warrantor designated shipping point freight allowed to Buyer s city or port of export fo...

Страница 50: ...50 RT SVX51H EN N No ot te es s...

Страница 51: ...RT SVX51H EN 51 N No ot te es s...

Страница 52: ...please visit trane com or americanstandardair com Trane and American Standard have a policy of continuous product and product data improvement and reserve the right to change design and specifications...

Отзывы: