Unit Description

Before shipment, each unit is leak tested, dehydrated,
charged with refrigerant and compressor oil, and run
tested for proper control operation.

Direct-drive, vertical discharge condenser fans are
provided with built-in thermal overload protection. The
stages of capacity control for these units are achieved
by starting the Economizer Control Actuator (ECA).

Economizer Control Actuator
Electromechanical Control

The ECA monitors the mixed air temperature, return air
temperature, minimum position setpoint (local or
remote), power exhaust setpoint, CO

2

setpoint, CO

2

,

and ambient dry bulb/ enthalpy sensor or comparative
humidity (return air humidity against ambient
humidity) sensors, if selected, to control dampers to an
accuracy of ±5 percent of stroke. The actuator is spring
returned to the closed position any time that power is
lost to the unit. It is capable of delivering up to 25 in

lb

of torque and is powered by 24 Vac.

JADE Economizer Control - Low Leak
Economizer (LLE) Only

The JADE controller is a standalone economizer
controller that provides outdoor air dry-bulb
economizer control standard. With optional Sylk Bus
sensors, the controller can provide comparative or
reference enthalpy control. Dampers are controlled to
an accuracy of ±3.2 percent of stroke. The actuator is
spring returned to the closed position any time that
power is lost to the actuator. It is capable of delivering
up to 88 in

lb of torque and is powered by 24 Vac.

System Input Devices and Functions

The unit must have a thermostat input in order to
operate.

For units with Low Leak Economizer (LLE), the
thermostat must be a smart thermostat as listed by the
CEC (a list of thermostats can be found at

http://www.

energy.ca.gov/title24/equipment_cert/ocst/index.html

).

The descriptions of the following basic input devices
used within the unit are to acquaint the operator with
their function as they interface with the various
features. Refer to the unit’s electrical schematic for the
specific device connections. The following controls are
available from the factory for field installation.

Drain Pan Condensate Overflow Switch
(Optional)

This input incorporates the Condensate Overflow
Switch (COF) mounted on the drain pan. When the
condensate level reaches the trip point, the COF relay
energizes and opens the 24 Vac control circuit,
disabling the unit. A delay timer prevents the unit from
starting for 3 minutes.

Phase Monitor

The Phase Monitor is a three-phase line monitor
module that protects against phase loss, phase reversal
and phase unbalance. It is intended to protect
compressors from reverse rotation. It has an operating
input voltage range of 190–600 Vac, and LED indicators
for ON and FAULT. There are no field adjustments and
the module will automatically reset from a fault
condition.

Discharge Line Thermostat Control

The high pressure controls and the discharge line
thermostat signals are wired in series and connected to
the safety input of the LSD. The compressor contactor
coil is connected to the ‘CC’ terminal of the LSD. If the
high pressure control switch or the discharge line
thermostat is open, the 24 Vac signal to the SI input of
the LSD is interrupted and the compressor contactor
coil supply is disabled by the LSD. It has an automatic
lockout.

Power Exhaust Control (Optional)

The power exhaust fan is started whenever the position
of the economizer dampers meets or exceed the power
exhaust setpoint when the indoor fan is on.

The setpoint panel is located in the return air section
and is factory set at 25% (50% for LLE).

To configure the LLE controller, set EXH1 SET (or EXH1
L & EXH1 H with two-speed fan) in the SETPOINTS
menu. 2-speed fan mode requires AUX2 I set as W.

Evaporator Frost Control

This input incorporates the Frostat

control (FOS)

mounted in the indoor coil and can be activated by
closing a field supplied contact installed in parallel with
the FOS.

If this circuit is open before the compressor is started,
the compressor will not be allowed to operate. Anytime
this circuit is opened for 5 continuous seconds during
compressor operation, the compressor for that circuit
is immediately turned “Off”. The compressor will not
be allowed to restart for a minimum of 3 minutes
should the FOS close.

Locking Safety Device with Anti-Short Cycle
Timer

This device monitors compressor safety switch trips to
prevent short cycling, protecting the compressor. A
manual reset is required after a fourth safety switch
trip.

Sensors

High Temperature Sensor (BAYFRST003*)

This sensor connects to the Emergency Stop Input on
the LTB and provides high limit “shutdown” of the unit.
The sensor is used to detect high temperatures due to
fire in the air conditioning or ventilation ducts. The

G

Ge

en

ne

erra

all IIn

nffo

orrm

ma

attiio

on

n

Содержание Foundation EBC180

Страница 1: ...Improperly installed adjusted or altered equipment by an unqualified person could result in death or serious injury When working on the equipment observe all precautions in the literature and on the t...

Страница 2: ...r p pr ro op pe er r P PP PE E f fo or r t th he e j jo ob b b be ei in ng g u un nd de er rt ta ak ke en n c co ou ul ld d r re es su ul lt t i in n d de ea at th h o or r s se er ri io ou us s i in...

Страница 3: ...ma ay y a af ff fe ec ct t t th he e w wa at te er r t ti ig gh ht t i in nt te eg gr ri it ty y o of f t th he e u un ni it t a an nd d l le ea ad d t to o w wa at te er r l le ea ak ks s i in nt to...

Страница 4: ...5 Verifying Proper Air Flow Units with Belt Drive Indoor Fan 25 Electromechanical Controls Test Procedure 25 Start Up 26 Electromechanical Controls Sequence Of Operation 26 Cooling without an Economiz...

Страница 5: ...tch 37 Cooling Season 37 Heating Season 38 Coil Cleaning 38 Troubleshooting 41 Standard Troubleshooting 41 Failures 41 Low Leak Economizer LLE Troubleshooting 41 Resetting Cooling and Heating Lockouts...

Страница 6: ...omizer Dry Bulb w o Barometric Relief L Downflow Low Leak Economizer Reference Enthalpy w o Barometric Relief N Downflow Low Leak Economizer Comparative Enthalpy w o Barometric Relief Digit 15 Supply...

Страница 7: ...tr ra at ti io on ns s r re eq qu ui ir ri in ng g a ad dd di it ti io on na al l r re es sp pi ir ra at to or ry y p pr ro ot te ec ct ti io on n U Us se e t th he e a ap pp pr ro op pr ri ia at te...

Страница 8: ...relay energizes and opens the 24 Vac control circuit disabling the unit A delay timer prevents the unit from starting for 3 minutes Phase Monitor The Phase Monitor is a three phase line monitor module...

Страница 9: ...he CO2 SPAN to 1600 ppm in the ADVANCED SETUP menu Occupancy Sensor A customer supplied occupancy sensor can also be added to provide damper control based on occupied unoccupied conditions Low Leak Ec...

Страница 10: ...zer airflows or recirculation of hot condenser air Figure 1 Typical installation clearance for single and multiple unit applications NOTES 1 FOR HORIZONTAL DISCHARGE UNIT THIS MEASUREMENT IS REDUCED T...

Страница 11: ...ONDENSATE DRAIN CONNECTION Figure 3 Cooling with optional electrical heat front and side views electric electric NOTES 1 THROUGH THE BASE ELECTRICAL IS NOT STANDARD ON ALL UNITS 2 VERIFY WEIGHT CONNEC...

Страница 12: ...DIMENSION WITH INSTALLER DOCUMENTS BEFORE INSTALLATION THROUGH THE BASE ELECTRICAL RETURN SUPPLY 64 9 16 71 15 16 14 15 16 7 7 16 7 3 8 123 1 8 36 1 16 6 15 16 6 13 16 68 9 16 Figure 5 Cooling with op...

Страница 13: ...51 MM 69 1 2 1765 MM Figure 7 Cooling with optional electrical heat downflow duct connections field fabricated 1 25 4 MM CURB FLANGE LONG SIDES 14 1 16 357 MM 7 7 16 189 MM 73 7 16 1865 MM 1 25 MM 19...

Страница 14: ...nal electric heat barometric relief and economizer NOTES 1 VERIFY WEIGHT CONNECTION AND ALL DIMENSION WITH INSTALLER DOCUMENTS BEFORE INSTALLATION 2 BAROMETRIC RELIEF IS FOR USE WITH A DOWNFLOW ECONOM...

Страница 15: ...manual damper NOTE VERIFY WEIGHT CONNECTION AND ALL DIMENSION WITH INSTALLER DOCUMENTS BEFORE INSTALLATION BACK VIEW OF UNIT LEFT VIEW OF UNIT FAN MANUAL DAMPER HOOD 123 1 8 18 1 4 26 7 8 24 7 8 12 1...

Страница 16: ...a as s n ne ec ce es ss sa ar ry y f fo or r e ev ve en n u un ni it t l li if ft t W WA AR RN NI IN NG G I Im mp pr ro op pe er r U Un ni it t L Li if ft t F Fa ai il lu ur re e t to o p pr ro op pe...

Страница 17: ...RT SVX50J EN 17 Figure 12 Rigging and center of gravity data CENTER OF GRAVITY LENGTH CENTER OF GRAVITY WIDTH W We ei ig gh ht ts s...

Страница 18: ...tion the unit and the curb must be level If the unit is installed at ground level elevate it above the snow line Provide concrete footings at each support location with a full perimeter support struct...

Страница 19: ...ermostat with or without switching subbase Connect properly sized control wiring to the proper termination points between the zone thermostat and the unit control panel Condensate Drain Configuration...

Страница 20: ...ce must be protected from over current and short circuit conditions in accordance with NEC requirements Protection devices must be sized according to the electrical data on the nameplate If the unit i...

Страница 21: ...t does not exceed three 3 ohms conductor for the length of the run N No ot te e Resistance in excess of 3 ohms per conductor could cause component failure due to insufficient AC voltage supply 3 Be su...

Страница 22: ...ct ts s b be ef fo or re e s se er rv vi ic ci in ng g F Fo ol ll lo ow w p pr ro op pe er r l lo oc ck ko ou ut t t ta ag go ou ut t p pr ro oc ce ed du ur re es s t to o e en ns su ur re e t th he...

Страница 23: ...ings need lubricating refer to the maintenance section of this manual for instructions Verify that a condensate trap is installed and the piping is properly sized and pitched Verify that the correct s...

Страница 24: ...of the factory installed disconnect switch Connect the power conductors to the lugs provided Connect the ground wire to the unit ground lug N No ot te e Wire size for the length of run should be dete...

Страница 25: ...ol ECA if applicable Electromechanical Controls Test Procedure See unit schematic for correct wire numbers F Fa an n T Te es st t a an nd d M Mi in ni im mu um m V Ve en nt ti il la at ti io on n Conn...

Страница 26: ...tside air dry bulb temperature Table 3 p 26 lists the selectable dry bulb values by potentiometer setting Table 3 Potentiometer settings Potentiometer Setting Dry Bulb Enthalpy A 27 Btu lb 63 kJ kg 73...

Страница 27: ...the trip point the COF relay energizes and opens the 24 Vac control circuit which disables the unit Once the 24 Vac control circuit is opened a delay timer will prevent unit start up for three minutes...

Страница 28: ...tor is a 3 phase line monitor module that protects against phase loss phase reversal and phase unbalance It is intended to protect compressors from reverse rotation It has an operating input voltage r...

Страница 29: ...to Full Open On On High 24 v On 0 v Off a VENTMIN to Full Open Closed to Full Open Above CO2 set No Off Off High 0 v Off 0 v Off VENTMIN to VENTMAX Closed On Off High 24 v On 0 v Off VENTMIN to VENTMA...

Страница 30: ...LY in Advanced setup menu can turn on 2nd stage of mechanical cooling Y2 O after the delay if the call for Y1 I and Y2 I have not been satisfied Table 9 Dry bulb operation no DCV CO2 sensor 2 speed fa...

Страница 31: ...satisfied b With 2SP FAN DELAY Advanced Setup Menu when in the economizing mode there is a delay for the high speed fan to try to satisfy the call for second stage cooling by turning on the fan to hi...

Страница 32: ...alpy boundaries parameters ES1 through ES5 Enth Curve Temp dry Bulb F Temp dewpoint F Enthalpy btu lb da Point P1 Point P2 Temp F Humid RH Temp F Humid RH ES1 80 0 60 0 28 0 80 0 36 8 66 3 80 1 ES2 75...

Страница 33: ...r temperature discharge limit opens the compressor on the affected circuit is turned off Coil Frost Protection The Frostat control monitors the evaporator coil temperature to prevent the evaporator fr...

Страница 34: ...pressure should rise If a scroll compressor is rotating backwards it will not pump and a loud rattling sound can be observed b If the electrical phasing is correct before condemning a compressor inter...

Страница 35: ...nel if applicable for proper unoccupied operation Refer to the programming instructions for the specific panel Verify that the Remote panel System selection switch Fan selection switch and Zone Temper...

Страница 36: ...w belts do not stretch them over the sheaves Loosen the belts using the belt tension adjustment bolts on the motor mounting base Once the new belts are installed using a Browning or Gates tension gaug...

Страница 37: ...er ri io ou us s i in nj ju ur ry y D Di is sc co on nn ne ec ct t a al ll l e el le ec ct tr ri ic c p po ow we er r i in nc cl lu ud di in ng g r re em mo ot te e d di is sc co on nn ne ec ct ts s...

Страница 38: ...ch circuit superheat and subcooling each circuit Record this data on an operator s maintenance log like the one shown in Sample maintenance log table in Final Process Section If the operating pressure...

Страница 39: ...thin walls of the MCHE coils the traditional field maintenance method recommended for Round Tube Plate Fin RTPF coils does not apply to microchannel coils Moreover chemical cleaners are a risk factor...

Страница 40: ...id Press Psig kPa Super heat F C Sub cool F C Compr Oil Level Suct Press Psig kPa Disch Press Psig kPa Liquid Press Psig kPa Super heat F C Sub cool F C ok low ok low ok low ok low ok low ok low ok lo...

Страница 41: ...ic ca al l c co om mp po on ne en nt ts s p pe er rf fo or rm m t th he es se e t ta as sk ks s Standard Troubleshooting Failures Cooling Failure 1 Cooling and heating set points slide pot on the the...

Страница 42: ...the Mode selection switch at the thermostat to the Off position After approximately 30 seconds turn the Mode selection switch to the desired mode i e Heat Cool or Auto Method 2 To reset the system at...

Страница 43: ...agrams Type of Airflow Schematic Type Voltage Diagram Number Description Constant Volume Power 208 575 1213 3649 Schematic PWR EM CO CV Control 208 575 1213 2968 EBC180 300 60Hz Cooling only Electric...

Страница 44: ...r s obligations and liabilities under this warranty are limited to furnishing F O B factory or warehouse at the warrantor designated shipping point freight allowed to Buyer s city or port of export fo...

Страница 45: ...RT SVX50J EN 45 N No ot te es s...

Страница 46: ...46 RT SVX50J EN N No ot te es s...

Страница 47: ...RT SVX50J EN 47 N No ot te es s...

Страница 48: ...please visit trane com or americanstandardair com Trane and American Standard have a policy of continuous product and product data improvement and reserve the right to change design and specifications...

Отзывы: