SSC-SVN001F-EN
17
Fig.09 - Resistance of crankcase
Recommended for position
fixing
Crankcase Resistance
Trane
recommends
the
use
of
crankcase when the load of the system
refrigerant load exceeds the refrigerant
compressor limit (RCL). The needs of
crankcase
resistance
are
directly
related to the possibility of liquid
migration to the compressor, and
consequently causing poor lubrication
of it. Migration can occur during long
periods of compressor shutdown (over
8 hours). The crankcase resistance is
recommended to eliminate the liquid
migration when these downtime long
periods.The crankcase resistance must
be installed on the compressor housing
and below the removal oil point. The
crankcase resistance must
remain
energized while the compressor is off.
This will prevent the dilution of oil and
the bearings overload in the initial com-
pressor starts. When the compressor is
off, the crankcase temperature should
Tab. 09 - Resistance of Crackcase
Power
Voltage
Trane Code
W
V
X1314
m in.
m áx.
Conexion Cable
Resistance
Fixing Chape
40
240
X13140740-01
1
140
155
1170
330
60
240
X13140710-01
1
185
210
520
460
60
480
X13140710-02
1
185
210
520
460
60
575
X13140710-03
1
185
210
520
460
60
230
X13140712-05
1
230
290
460
740
60
380
X13140712-06
1
230
290
460
740
60
460
X13140712-08
1
230
290
460
740
60
230
X13140712-11
2
300
375
560
890
60
460
X13140712-14
2
300
375
560
890
60
70
100
160
Cra ckcase Resista nce
Quantity
Diam eter (m m )
Length (m m )
Electrical Data
be kept at least 10°C above the
refrigerant temperature in the suction
side
(low
pressure
side).
This
requirement ensures that the refrigerant
will not be retained in the compressor
crankcase. Tests can be done to
ensure
that
the
appropriate
temperature of the oil is maintained
below
the
ambient
conditions
(temperature and wind).
Therefore, for a temperature below -
5°C and an over 5m/s wind speed, it is
recommended that the resistors be
thermally isolated to limit the energy
loss to the environment.
Attention:
The strength of crankcase must be
energized at least 12 hours before
the startup of the compressor (with
the service valves open) and should
be maintained until the compressor
energized startup.
!
Содержание CXPA
Страница 30: ...30 SSC SVN001F EN Fig 37 Dimensions Condensing Units TRAE 150 2 circuits TRAE Dimensional Data...
Страница 31: ...SSC SVN001F EN 31 Fig 38 Dimensions Condensing Units TRAE 200 1 Circuit TRAE Dimensional Data...
Страница 32: ...32 SSC SVN001F EN TRAE Dimensional Data Fig 39 Dimensions Condensing Units TRAE 200 2 Circuits...
Страница 33: ...SSC SVN001F EN 33 TRAE Dimensional Data Fig 40 Dimensions Condensing Units TRAE 250 1 Circuit...
Страница 34: ...34 SSC SVN001F EN TRAE Dimensional Data Fig 41 Dimensions Condensing Units TRAE 250 2 Circuits...
Страница 35: ...SSC SVN001F EN 35 TRAE Dimensional Data Fig 42 Dimensions Condensing Units TRAE 300 2 Circuits...