26/115
V07-19.0
Figure 17:
Sealing agent (Sikaflex)
Figure 18:
Applying the sealing agent
Pulling together AHU sections
The AHU sections must be aligned precisely and the front sides shall be exactly parallel to the
other. If necessary, some minor corrections can be made by placing steel plates under the section.
The AHU sections can be pulled together with belts which attach on the base frame, as shown on
Figure 19:
Pulling AHU sections together
Figure 20:
Pulling AHU sections together (detail)
5.1.2
Standard connections and connection components
The connection via base frame must be always made at all AHUs, see
Figure 21:
Hexagon bolt with locknut M8x20 /
M10x30 / M12x40
Figure 22:
Bolt connection of base frames
Содержание CCE-Compact Series
Страница 1: ...July 2019 AH SVX007A GB Installation Operation Maintenance CCE Compact Air Handling Unit...
Страница 60: ...60 115 V07 19 0 User manual COMPACT V0 03 April 2018 Hotline 39 335 1334212...
Страница 92: ...92 115 V07 19 0 Data point list COMPACT V0 06 April 2018 Hotline 39 335 1334212...