ACC-SVN150F-EN
7
Figure 4. Remove insulation
4. Cut or break tabs around the perimeter of the
removable panel (K) exposed in previous step, and
discard panel. See figure below.
IIm
mp
po
orrtta
an
ntt:: On down flow units, ensure panel does
not fall inside unit and into duct work.
Figure 5. Remove heater access panel
5. Through the opening, locate the bracket attached to
the indoor fan panel on top (see figure below).
Insert heater at an angle into opening while holding
the rear side higher than the front. As heater is
inserted through the opening, this insures the
heater flanges are above the bracket flanges in the
unit. The heater flanges rest on the flanges of the
support brackets located inside and to the rear of
the area where heater is being installed. Slide
heater assembly over the flanges, all the way
through.
N
No
otte
e:: Make sure the flange side of the heater back
plate is on top.
Figure 6. Support brackets inside the opening
See Detail A
Detail A
Detail A
6. Secure heater with ¾" sheet metal screws provided
in the ship-with packet, shooting through the pre-
drilled holes. See figure below.
Figure 7. Slide heater into opening
Front View
Side View
Bottom View
Electric
Heater
Heater
Vestibule
Bracket
7. Using the remaining screws, install the heater
control assembly on to the vestibule as illustrated
below.
Содержание BAYHTFAK18AA
Страница 13: ...ACC SVN150F EN 13 N No ot te es s ...
Страница 14: ...14 ACC SVN150F EN N No ot te es s ...
Страница 15: ...ACC SVN150F EN 15 N No ot te es s ...