background image

Page 5

INSTALLER'S GUIDE

STEP 2

 - Disconnect & Dispose of Pigtail Harness.

1.    Remove the screw mounted wire tie that is holding the 

pigtail harness and case ground wire to the cabinet.  
Remove the wire tie from the two green ground wires.

2.    Unplug and dispose of pigtail harness.

Section 5. Install Heater

STEP 1

 - Remove Heater Compartment Panel.

Heater  

Compartment 

Panel

3.    Place the circuit breakers back into the control box.  

The tabs on the breakers are spring loaded and will 
snap back to their locked position once the breakers 
are properly seated.

Field 

Connections

ON

Circuit 

Breaker

Control 

Box

Factory 

Connections

Circuit Breaker 

Assembly - Rotated

Pigtail  

Harness

Wire Tie

Содержание BAYEVCC25BK1

Страница 1: ...itioning product may result in personal injury and or property damage The manufacturer or seller cannot be responsible for the interpretation of this information nor can it as sume any liability in co...

Страница 2: ...or damage Report any defects or shortages to the transportation company im mediately 3 Be sure the power supply matches the listing shown on the heater nameplate Section 2 General Information Section...

Страница 3: ...ght front of the heater and connected with a ring terminal to the heater base plate 3 Disconnect the two ground wires from the lug on the heater base plate Note It is recommended that the ducting be a...

Страница 4: ...order to comply with National Electric Code NEC Section 240 81 The NEC requires that circuit breakers operated verti cally must be oriented so that the on position of the breaker is upward Field Conne...

Страница 5: ...nplug and dispose of pigtail harness Section 5 Install Heater STEP 1 Remove Heater Compartment Panel Heater Compartment Panel 3 Place the circuit breakers back into the control box The tabs on the bre...

Страница 6: ...e retainer tab into recess in air handler cabinet 2 Tighten screws to hold tab securely 3 Repeat actions to secure the other tab STEP 5 Select a conduit entry point See the orientations on the followi...

Страница 7: ...Page 7 INSTALLER S GUIDE Upflow Route conduit as shown Downflow Route conduit as shown Note A minimum of 8 is required for installation and servicing of the control box 8 Min...

Страница 8: ...Page 8 INSTALLER S GUIDE Horizontal Left Route conduit as shown Horizontal Right Route conduit as shown...

Страница 9: ...he screw removed earlier See Section 4 Step 1 for illustration 4 Reconnect the 3 pin plug on the heater to the 3 pin plug in the air handler case 5 Reconnect the two ground wires to the lug on the bas...

Страница 10: ...low voltage harness to Electric Heat Control connector on the board as shown Low Voltage Harness STEP 10 Place Wiring Diagram 1 Attach the wiring diagram included in the documenta tion packet to the...

Страница 11: ...ircuit Therefore the branch circuit s shall be sized and protected according to the unit nameplate Table 6 1 BAYEV HEATER DATA Heater Model No Number of Circuits 240 VOLT 208 VOLT Capacity Heater Amps...

Страница 12: ...only is energized the K2 relay would close and ener gize the B heater The third time W1 only is energized the K3 relay would close and energize the C heater Electric Heat 1 When a request for electric...

Отзывы: