Trane BAYECON300 Series Скачать руководство пользователя страница 1

0-100% Down flow Dry Bulb
Economizer

Foundation™ Packaged Cooling and Gas/
Electric
15 to 25 Tons

Installation Instructions

September 2021

ACC-SVN155D-EN

Model Number:

Used With:

BAYECON300*

E/GBC180-300

SAFETY WARNING

Only qualified personnel should install and service the equipment. The installation, starting up, and servicing of
heating, ventilating, and air-conditioning equipment can be hazardous and requires specific knowledge and training.
Improperly installed, adjusted or altered equipment by an unqualified person could result in death or serious injury.
When working on the equipment, observe all precautions in the literature and on the tags, stickers, and labels that are
attached to the equipment.

Содержание BAYECON300 Series

Страница 1: ...tall and service the equipment The installation starting up and servicing of heating ventilating and air conditioning equipment can be hazardous and requires specific knowledge and training Improperly...

Страница 2: ...that is used in these service procedures In addition some states or municipalities may have additional requirements that must also be adhered to for responsible management of refrigerants Know the ap...

Страница 3: ...ations Introduction ACC SVN155D EN 3 Copyright This document and the information in it are the property of Trane and may not be used or reproduced in whole or in part without written permission Trane...

Страница 4: ...ail Request an immediate joint inspection of the damage by the carrier and the consignee Note Do not attempt to repair any damaged parts until the parts are inspected by the carrier s representative P...

Страница 5: ...onnects and discharge all motor start run capacitors before servicing Follow proper lockout tagout procedures to ensure the power cannot be inadvertently energized Verify with a CAT III or IV voltmete...

Страница 6: ...in Figure 6 Figure 6 Install return air damper assembly Carrier 3 a Attach block off 5 to unit using four screws as illustrated in Figure 7 The block off is designed to close the opening created betw...

Страница 7: ...Figure 9 e Secure economizer using 4 screws on left side and 4 screws on right side as illustrated in Figure 9 f Attach connecting rod bracket to outdoor damper blade using two screws on each side as...

Страница 8: ...er assembly outward into the operating position See Figure 13 5 Remove approximately 3 of gasket material from the bottom of each corner post to expose the holes used to attach the economizer assembly...

Страница 9: ...ver 2 Remove block off 8 from return air opening Figure 17 Remove block off 3 Remove Trane connecting rods 4 from the unit Figure 18 Remove connecting rods 4 Switch return air damper assembly 3 from T...

Страница 10: ...inlet Figure 22 Attach block off plate 8 Attach Filter and Rear access panels Mist Eliminator Servicing 1 Remove screws from end panel that secure it to the unit and economizer 2 Set end panel aside 3...

Страница 11: ...atures See Table 1 for potentiometer settings The selection is made on the ECA Reference Enthalpy Settings Economizer enthalpy changeover is field selectable to 5 points See Table 1 for potentiometer...

Страница 12: ...ations without notice We are committed to using environmentally conscious print practices Trane and American Standard create comfortable energy efficient indoor environments for commercial and residen...

Отзывы: