Trane Axiom GWS Series Скачать руководство пользователя страница 69

WSHP-SVX015C-EN

69

Troubleshooting

W

WA

AR

RN

NIIN

NG

G

H

Ha

azza

arrd

do

ou

uss S

Se

errv

viicce

e P

Prro

occe

ed

du

urre

ess!!

F

Fa

aiillu

urre

e tto

o ffo

ollllo

ow

w a

allll p

prre

ecca

au

uttiio

on

nss iin

n tth

hiiss m

ma

an

nu

ua

all a

an

nd

d

o

on

n tth

he

e tta

ag

gss,, ssttiicckke

errss,, a

an

nd

d lla

ab

be

ellss cco

ou

ulld

d rre

essu

ulltt iin

n

d

de

ea

atth

h o

orr sse

erriio

ou

uss iin

njju

urry

y..

T

Te

ecch

hn

niicciia

an

nss,, iin

n o

orrd

de

err tto

o p

prro

otte

ecctt tth

he

em

msse

ellv

ve

ess ffrro

om

m

p

po

otte

en

nttiia

all e

elle

eccttrriicca

all,, m

me

ecch

ha

an

niicca

all,, a

an

nd

d cch

he

em

miicca

all

h

ha

azza

arrd

dss,, M

MU

US

ST

T ffo

ollllo

ow

w p

prre

ecca

au

uttiio

on

nss iin

n tth

hiiss m

ma

an

nu

ua

all

a

an

nd

d o

on

n tth

he

e tta

ag

gss,, ssttiicckke

errss,, a

an

nd

d lla

ab

be

ellss,, a

ass w

we

ellll a

ass tth

he

e

ffo

ollllo

ow

wiin

ng

g iin

nssttrru

uccttiio

on

nss:: U

Un

nlle

essss ssp

pe

ecciiffiie

ed

d o

otth

he

errw

wiisse

e,,

d

diisscco

on

nn

ne

ecctt a

allll e

elle

eccttrriicca

all p

po

ow

we

err iin

nccllu

ud

diin

ng

g rre

em

mo

otte

e

d

diisscco

on

nn

ne

ecctt a

an

nd

d d

diisscch

ha

arrg

ge

e a

allll e

en

ne

errg

gy

y sstto

orriin

ng

g

d

de

ev

viicce

ess ssu

ucch

h a

ass cca

ap

pa

acciitto

orrss b

be

effo

orre

e sse

errv

viicciin

ng

g..

F

Fo

ollllo

ow

w p

prro

op

pe

err llo

occkko

ou

utt//tta

ag

go

ou

utt p

prro

occe

ed

du

urre

ess tto

o

e

en

nssu

urre

e tth

he

e p

po

ow

we

err cca

an

n n

no

ott b

be

e iin

na

ad

dv

ve

errtte

en

nttlly

y

e

en

ne

errg

giizze

ed

d.. W

Wh

he

en

n n

ne

ecce

essssa

arry

y tto

o w

wo

orrkk w

wiitth

h lliiv

ve

e

e

elle

eccttrriicca

all cco

om

mp

po

on

ne

en

nttss,, h

ha

av

ve

e a

a q

qu

ua

alliiffiie

ed

d lliicce

en

nsse

ed

d

e

elle

eccttrriicciia

an

n o

orr o

otth

he

err iin

nd

diiv

viid

du

ua

all w

wh

ho

o h

ha

ass b

be

ee

en

n

ttrra

aiin

ne

ed

d iin

n h

ha

an

nd

dlliin

ng

g lliiv

ve

e e

elle

eccttrriicca

all cco

om

mp

po

on

ne

en

nttss

p

pe

errffo

orrm

m tth

he

esse

e tta

asskkss..

ReliaTel

Controls

The RTRM has the ability to provide the service
personnel with some unit diagnostics and system
status information.

Before turning the main power disconnect switch
“Off”, follow the steps below to check the ReliaTel

Refrigeration Module (RTRM). All diagnostics & system
status information stored in the RTRM will be lost when
the main power is turned “Off”.

To prevent injury or death from electrocution, it is the
responsibility of the technician to recognize this hazard
and use extreme care when performing service
procedures with the electrical power energized.

1. Verify that the Liteport LED on the RTRM is burning

continuously. If the LED is lit, go to Step 3.

2. If the LED is not lit, verify that 24 VAC is presence

between J1-1 and J1-2. If 24 Vac is present, proceed
to Step 3. If 24 Vac is not present, check the unit
main power supply, check transformer (TNS1).
Proceed to Step 3 if necessary.

3. Utilizing “Method 1” or “Method 2” in the “System

Status Checkout Procedure ” section, check the
following:

System status

Heating status

Cooling status

If a System failure is indicated, proceed to Step 4. If
no failures are indicated, proceed to Step 5.

4. If a System failure is indicated, recheck Steps 1 and

2. If the LED is not lit in Step 1, and 24 VAC is

present in Step 2, the RTRM has failed. Replace the
RTRM.

5. If no failures are indicated, use one of the TEST

mode procedures described in the “Unit Start-Up”
section to start the unit. This procedure will allow
you to check all of the RTRM outputs, and all of the
external controls (relays, contactors, etc.) that the
RTRM outputs energize, for each respective mode.
Proceed to Step 6.

6. Step the system through all of the available modes,

and verify operation of all outputs, controls, and
modes. If a problem in operation is noted in any
mode, you may leave the system in that mode for
up to one hour while troubleshooting. Refer to the
sequence of operations for each mode, to assist in
verifying proper operation. Make the necessary
repairs and proceed to Steps 7 and 8.

7. If no abnormal operating conditions appear in the

test mode, exit the test mode by turning the power
“Off” at the main power disconnect switch.

8. Refer to the individual component test procedures if

other microelectronic components are suspect.

System Status Checkout
Procedure

“System Status” is checked by using one of the
following two methods:

Method 1

If the Zone Sensor Module (ZSM) is equipped with a
remote panel with LED status indication, you can check
the unit within the space. If the ZSM does not have
LED’s, use Method 2. BAYSENS110*, and
BAYSENS119* all have the remote panel indication
feature. The LED descriptions are listed below.

LED 1 (System)

“On” during normal operation.

“Off” if a system failure occurs or the LED fails.

“Flashing” indicates test mode.

LED 2 (Heat)

“On” when the heat cycle is operating.

“Off” when the heat cycle terminates or the LED fails.

“Flashing” indicates a heating failure.

LED 3 (Cool)

“On” when the cooling cycle is operating.

“Off” when the cooling cycle terminates or the LED
fails.

“Flashing” indicates a cooling failure.

Содержание Axiom GWS Series

Страница 1: ...roperly installed adjusted or altered equipment by an unqualified person could result in death or serious injury When working on the equipment observe all precautions in the literature and on the tags...

Страница 2: ...t th he e j jo ob b b be ei in ng g u un nd de er rt ta ak ke en n c co ou ul ld d r re es su ul lt t i in n d de ea at th h o or r s se er ri io ou us s i in nj ju ur ry y T Te ec ch hn ni ic ci ia a...

Страница 3: ...li ic ci ie es s c ca an n b be e f fo ou un nd d o on n t th he e B BO OS S s si it te e W Wh he er re e l lo oc ca al l r re eg gu ul la at ti io on ns s a ar re e m mo or re e s st tr ri in ng ge e...

Страница 4: ...Detector Sensor Optional 12 Zone Sensors 12 Zone Sensor Module ZSM BAYSENS107 12 Zone Sensor BAYSENS109 12 Programmable Zone Sensor BAYSENS119 12 Remote Zone Sensor BAYSENS073 12 Remote Zone Sensor BA...

Страница 5: ...12 5 to 20 Tons 50 Prerequisite 50 Smoke Detector Installation 50 Airflow Sampling 52 Air Fi Wireless Communication Interface WCI 3 to 10 Ton Units 53 Air Fi Wireless Communication Interface WCI 12 5...

Страница 6: ...Temperature Sensor ZTS Tests 71 Test 1 Zone Temperature Thermistor ZTEMP 71 Test 2 Cooling Set Point CSP and Heating Set Point HSP 71 Test 3 System Mode and Fan Selection 71 Test 4 LED Indicator Test...

Страница 7: ...tandard Panels Standard Filters10 A Hinged Access Standard Filters10 B Standard Panels 2 MERV 8 Filters C Hinged Access 2 MERV 8 Filters D Standard Panels MERV 13 Filters E Hinged Access MERV 13 Filte...

Страница 8: ...odels Belt drive standard on 6 and 12 5 to 20 ton models Variable speed direct drive standard on 7 5 to 10 ton models 8 Available factory installed on downflow AND horizontal units Verify with orderin...

Страница 9: ...wn n t to o t th he e s st ta at te e o of f C Ca al li if fo or rn ni ia a t to o c ca au us se e c ca an nc ce er r t th hr ro ou ug gh h i in nh ha al la at ti io on n Y Yo ou u M MU US ST T w we e...

Страница 10: ...t power is lost to the unit It is capable of delivering up to 25 inch pounds of torque and is powered by 24 Vac RTCI ReliaTel Trane Communication Interface Optional This module is used when the applic...

Страница 11: ...switch with different pressure settings will be installed This switch will close when the differential pressure is approximately 0 8 w c and open when the differential falls to 0 7 w c Compressor Dis...

Страница 12: ...Installation and Maintenance Instructions provided with the literature package for this unit In order for the supply air smoke detector or return air smoke detector to properly sense smoke in the sup...

Страница 13: ...mostat and a 7 day programmable stat with night setback shall be available In addition it is wall mounted Thermostat BAYSTAT151 This thermostat is a single stage 1 heat 1 cool auto changeover digital...

Страница 14: ...14 WSHP SVX015C EN Unit Dimensions Figure 1 Typical installation clearances for single multiple unit applications GWSC036 048 Units GWSC060 120 Units...

Страница 15: ...OF UNIT UNIT CONTROL WIRE 7 8 DIA HOLE RETURN OPENING AS SHIPPED SUPPLY OPENING AS SHIPPED THROUGH THE BASE 7 8 CONDENSATE DRAIN BASE HOLE FOR WATER OUT CONN BASE HOLE FOR WATER IN CONN THROUGH THE BA...

Страница 16: ...7 8 DIA HOLE RETURN OPENING AS SHIPPED SUPPLY OPENING AS SHIPPED THROUGH THE BASE 7 8 CONDENSATE DRAIN BASE HOLE FOR WATER OUT CONN BASE HOLE FOR WATER IN CONN THROUGH THE BASE ELECTRICAL WATER OUT CO...

Страница 17: ...13 16 1568 MM 65 3 16 1656 MM 16 3 4 425 MM 2 51 MM 2 51 MM 40 7 8 1038 MM 41 7 16 1053 MM Figure 6 WSHP rooftop 3 to 4 tons downflow duct connections field fabricated N No ot te e Reference tabular...

Страница 18: ...18 WSHP SVX015C EN Figure 9 WSHP rooftop 3 to 4 tons swing diameter for hinged door s option 17 7 8 16 22 1 4 U Un ni it t D Di im me en ns si io on ns s...

Страница 19: ...W SIDE VIEW TOP VIEW FRONT OF UNIT UNIT CONTROL WIRE 7 8 DIA HOLE RETURN OPENING AS SHIPPED SUPPLY OPENING AS SHIPPED THROUGH THE BASE 7 8 CONDENSATE DRAIN BASE HOLE FOR WATER OUT CONN BASE HOLE FOR W...

Страница 20: ...OP VIEW FRONT OF UNIT UNIT CONTROL WIRE 7 8 DIA HOLE RETURN OPENING AS SHIPPED SUPPLY OPENING AS SHIPPED THROUGH THE BASE 7 8 CONDENSATE DRAIN BASE HOLE FOR WATER OUT CONN BASE HOLE FOR WATER IN CONN...

Страница 21: ...EW SIDE VIEW TOP VIEW FRONT OF UNIT UNIT CONTROL WIRE 7 8 DIA HOLE RETURN OPENING AS SHIPPED SUPPLY OPENING AS SHIPPED THROUGH THE BASE 7 8 CONDENSATE DRAIN BASE HOLE FOR WATER OUT CONN BASE HOLE FOR...

Страница 22: ...EW SIDE VIEW TOP VIEW FRONT OF UNIT UNIT CONTROL WIRE 7 8 DIA HOLE RETURN OPENING AS SHIPPED SUPPLY OPENING AS SHIPPED THROUGH THE BASE 7 8 CONDENSATE DRAIN BASE HOLE FOR WATER OUT CONN BASE HOLE FOR...

Страница 23: ...8 1280 MM 2 51 MM 83 7 8 2130 MM 80 1 2 2045 MM 18 1 2 470 MM 1 25 MM 6 5 8 168 MM 18 1 4 470 MM 1 25 MM RETURN SUPPLY Figure 16 WSHP rooftop 5 to 10 tons downflow duct connections field fabricated N...

Страница 24: ...24 WSHP SVX015C EN Figure 19 WSHP rooftop 5 to 10 tons swing diameter for hinged door s option 21 3 8 17 34 5 8 U Un ni it t D Di im me en ns si io on ns s...

Страница 25: ...1 2 3 7 8 2 27 5 8 24 1 8 26 1 2 121 3 4 54 6 7 8 56 33 1 4 1 9 2 3 4 7 5 8 26 7 8 BOTTOM VIEW SHOWN FROM TOP FRONT VIEW SIDE VIEW BACK VIEW RETURN OPENING SUPPLY OPENING DRAIN CONN 1 NPT FRONT OF EVA...

Страница 26: ...n inches millimeters Figure 22 WSHP rooftop models 12 5 to 15 tons All dimensions are in inches millimeters Figure 23 WSHP rooftop models 12 5 to 15 tons 9 1 25 4 MM CURB FLANGE LONG SIDES SHORT SIDES...

Страница 27: ...WSHP SVX015C EN 27 Figure 24 WSHP rooftop models 12 5 to 15 tons All dimensions are in inches millimeters U Un ni it t D Di im me en ns si io on ns s...

Страница 28: ...1 8 26 1 2 121 3 4 64 6 7 8 56 33 1 4 1 9 2 3 4 7 5 8 24 1 4 BOTTOM VIEW SHOWN FROM TOP FRONT VIEW SIDE VIEW BACK VIEW RETURN OPENING SUPPLY OPENING DRAIN CONN 1 NPT FRONT OF EVAPORATOR ACCESS PANEL C...

Страница 29: ...tons 9 1 25 4 MM CURB FLANGE LONG SIDES SHORT SIDES Duct flanges mount 7 7 16 down inside the curb on the 1 1 curb flanges Roofcurb is intended for downflow use only All dimensions are in inches mill...

Страница 30: ...16 68 11 16 1 NPT 26 3 4 5 3 8 Figure 30 Through the base utility locations and access panel swing clearances SWING RADIUS C OD SECTION ACCESS PANEL THROUGH THE BASE ELECTRICAL SWING RADIUS A ID SECTI...

Страница 31: ...s Unit Model A B C D E GWSD150 180 42 3 8 48 3 8 31 N A N A GWSD240 29 1 2 56 38 1 2 18 1 2 N A GWSH150 180 42 3 8 N A 31 N A 12 GWSH240 29 1 2 N A 38 1 2 18 1 2 14 Note All dimensions are in inches U...

Страница 32: ...s s u us se ed d t to o l li if ft t t th he e u un ni it t m mu us st t b be e c ca ap pa ab bl le e o of f s su up pp po or rt ti in ng g t th he e e en nt ti ir re e w we ei ig gh ht t o of f t th...

Страница 33: ...pallet must be completed before unit can be set Prior to lifting the unit remove the 6 fork pockets from the base rails and 4 wood screws from the lifting lug corners The unit will then separate from...

Страница 34: ...he e r ro oo of f s st tr ru uc ct tu ur re e i is s s st tr ro on ng g e en no ou ug gh h t to o s su up pp po or rt t t th he e c co om mb bi in ne ed d w we ei ig gh ht t o of f t th he e r ro oo...

Страница 35: ...ic Heat Units N No ot te e Applies only to 3 to 10 ton units Units are factory shipped in the downflow discharge configuration but can be field converted to a horizontal discharge configuration Some b...

Страница 36: ...oor coil Filter Installation Each unit ships with 2 inch filters installed The quantity of filters is determined by unit size Access to the filters is obtained by removing the filter access panel Refe...

Страница 37: ...RTV Sealant 5 Slide RETURN DUCT COVER insulation side up into supply opening until inward edge of duct cover engages with the 2 retaining clips on the duct flange Secure outward edge of the duct cove...

Страница 38: ...r s se er ri io ou us s i in nj ju ur ry y A Al ll l f fi ie el ld d w wi ir ri in ng g M MU US ST T b be e p pe er rf fo or rm me ed d b by y q qu ua al li if fi ie ed d p pe er rs so on nn ne el l I...

Страница 39: ...s T To o a av vo oi id d t th he es se e h ha az za ar rd ds s y yo ou u M MU US ST T f fo ol ll lo ow w r re eq qu ui ir re em me en nt ts s f fo or r f fi ie el ld d w wi ir ri in ng g i in ns st t...

Страница 40: ...conductors with ReliaTel for AC conductor sizing guidelines 1 Use copper conductors unless otherwise specified 2 Ensure that the AC control wiring between the controls and the unit s termination point...

Страница 41: ...g Distance from Unit to Control Recommended Wire Size 0 150 feet 0 45 7 m 22 gauge 0 33 mm2 151 240 feet 46 73 1 m 20 gauge 0 50 mm2 241 385 feet 73 5 117 3 m 18 gauge 0 75 mm2 386 610 feet 117 7 185...

Страница 42: ...ptional controls BAYSENS119 BAYSENS075 BAYSENS075 BAYSENS075 BAYSENS107 ASYSTAT666 ASYSTAT669 BAYSTAT023 BAYSENS073 BAYSENS109 ASYSTAT669 ASYSTAT669 BAYSENS109 BAYSENS074 BAYSENS077 ASYSTAT669 Figure...

Страница 43: ...re averaging Example 1 illustrates two series circuits with two sensors in each circuit wired in parallel The square of any number of remote sensors is required Example 2 illustrates three sensors squ...

Страница 44: ...34 85 K Ohms 35 1 7 30 18 K Ohms 40 4 4 26 22 K Ohms 45 7 2 22 85 K Ohms Table 7 Temperature vs resistance continued Temperature Nominal Resistance Degrees F Degrees C 50 10 0 19 96 K Ohms 55 12 8 17...

Страница 45: ...L2 Yellow phase C to L3 Close the field supplied main power disconnect switch or circuit protector switch that provides the supply power to the unit Observe the ABC and CBA phase indicator lights on...

Страница 46: ...te or it can be terminated by opening the main power disconnect switch Once the test mode has been terminated the Liteport LED will glow continuously and the unit will revert to the System control Fin...

Страница 47: ...by y q qu ua al li if fi ie ed d p pe er rs so on nn ne el l I Im mp pr ro op pe er rl ly y i in ns st ta al ll le ed d a an nd d g gr ro ou un nd de ed d f fi ie el ld d w wi ir ri in ng g p po os s...

Страница 48: ...di it ti io on na al l i in nf fo or rm ma at ti io on n r re eg ga ar rd di in ng g t th he e s sa af fe e d di is sc ch ha ar rg ge e o of f c ca ap pa ac ci it to or rs s s se ee e P PR RO OD D S...

Страница 49: ...t in the operating position 2 Remove the 3 screws from the mounting brackets Refer to downflow view for screw locations N No ot te e Refer to downflow view for screw locations Figure 52 Downflow view...

Страница 50: ...rt te en nt tl ly y e en ne er rg gi iz ze ed d V Ve er ri if fy y w wi it th h a a C CA AT T I II II I o or r I IV V v vo ol lt tm me et te er r r ra at te ed d p pe er r N NF FP PA A 7 70 0E E t th...

Страница 51: ...BE FACTORY INSTALLED PLASTIC ELBOW VINYL TUBES 7 3 4 INCHES LONG TWO PIECE HOOD METAL INTAKE TUBE METAL EXHAUST TUBE 16 34 INCHES LONG VINYL TUBES 2 INCHES LONG TUBES INSTALL FROM BOTTOM TOP DOES NOT...

Страница 52: ...fer to Return Air Smoke Detector 12 5 to 20 Tons p 50 for wire connections of return air smoke detector to the unit wiring harness 10 This completes the installation of the return air smoke detector I...

Страница 53: ...10 ton units 3 Mount the bracket in the horizontal discharge location Refer to horizontal view for screw and bracket location Figure 58 Wireless communication interface horizontal 3 to 5 ton units N...

Страница 54: ...ounting location GWSD150 240 Air Fi Figure 60 WCI mounting location GWSH150 240 Air Fi Figure 61 WCI mounting location GWSD150 240 with low leak economizer F Fa ac ct to or ry y M Mo ou un nt te ed d...

Страница 55: ...on On Selectable Off Off Off Off 2 Economizer Test Open On Open Off Off Off Off 3 3K 3 Cool Stage 1 On Minimum Position On Off Off Off 4 7K 4 a Cool Stage 2 On Minimum Position On On Off Off 6 8K 5 a...

Страница 56: ...voltage between the two terminals Reference the RPM table in the Performance Data section for fan speed Use Service TEST Mode to adjust maximum motor speed using modes listed below 1 TEST Mode Cool 2...

Страница 57: ...for component operation momentarily jump across the Test 1 Test 2 terminals on LTB1 one time to start the Minimum Ventilation Test Once the supply fan has started check for proper rotation The directi...

Страница 58: ...a set of refrigeration gauges hooked up to the suction and discharge pressure port If the compressor is phased correctly the suction pressure should drop and the discharge pressure should rise when th...

Страница 59: ...previous component start up or until the desired start up component Test is started 6 Verify that the heater stage is operating properly 7 To stop the Service Test turn the main power disconnect switc...

Страница 60: ...11 14 36 47 86 9 0 143 165 302 385 10 13 24 29 186 214 348 443 9 11 36 47 95 7 2 145 167 346 441 13 16 23 29 95 9 0 145 167 338 431 10 13 24 29 Table 12 GWSC048H Operating pressures in cooling heating...

Страница 61: ...88 216 356 453 9 11 36 47 95 12 0 139 160 351 446 11 14 22 27 95 15 0 139 159 343 436 9 11 22 28 Table 14 GWSC072H Operating pressures in cooling heating Operating Data Model Entering Water Temp F Wat...

Страница 62: ...8 184 211 364 463 9 12 37 49 95 18 0 135 155 352 448 11 14 22 27 95 22 5 135 155 344 438 9 11 22 27 Table 16 GWSC120H Operating pressures in cooling heating Operating Data Model Entering Water Temp F...

Страница 63: ...8 18 23 21 27 185 213 359 457 17 22 34 45 95 31 0 143 164 367 467 22 28 21 26 95 38 8 143 164 359 456 18 22 21 26 Table 18 GWS 180 Operating pressures in cooling heating Operating Data Model Entering...

Страница 64: ...8 10 12 22 28 123 142 324 412 7 9 34 45 75 49 6 115 132 275 350 12 15 22 27 133 153 334 425 10 12 36 47 75 62 0 115 132 267 340 10 12 22 27 138 158 337 429 8 10 37 48 86 49 6 117 134 318 405 12 15 21...

Страница 65: ...o t th he e a ap pp pr ro op pr ri ia at te e m ma an nu uf fa ac ct tu ur re er r s s l li it te er ra at tu ur re e f fo or r a al ll lo ow wa ab bl le e w wa ai it ti in ng g p pe er ri io od ds s...

Страница 66: ...coil and filters To insure that airflow through the unit is adequate for proper sampling by the return air smoke detector complete adherence to the maintenance procedures including recommended interva...

Страница 67: ...ro on n o or r s su ui it t a as s r re eq qu ui ir re ed d F Fo or r p pe er rs so on na al l s sa af fe et ty y r re ef fe er r t to o t th he e c cl le ea an ni in ng g a ag ge en nt t m ma an nu...

Страница 68: ...ematic s _________________________________________ _________________________________________ connection s _________________________________________ _________________________________________ Table 22 S...

Страница 69: ...system status information stored in the RTRM will be lost when the main power is turned Off To prevent injury or death from electrocution it is the responsibility of the technician to recognize this h...

Страница 70: ...en 32 Vdc 0 75 Vdc Heat Failure Measure the voltage between terminals J6 7 J6 6 Heat Operating approximately 32 Vdc Heat Off less than 1 VDC approximately 0 75 Vdc Heating Failure voltage alternates b...

Страница 71: ...ormal operation after 6 continuous seconds with the COF in a non tripped condition If the condensate level causes the unit to shut down more than 2 times in a 3 day period the unit will be locked out...

Страница 72: ...out 19 Vdc while the voltage on the high end will measure from approximately 24 to 38 Vdc 4 Verify all modes of operation by running the unit through all of the steps in the Test Modes section discuss...

Страница 73: ...r ECA LED indicator OFF No Power or Failure ON Normal OK to Economize Slow Flash Normal Not OK to Economize Fast Flash 1 2 Second On 2 Seconds Off Error Code Communications Failure Table 24 Verify eco...

Страница 74: ...m shipment There is a standard 5 year compressor warranty Extended Warranty The optional extended warranty is a second through fifth year warranty The time starts at the end of the standard 1 year cov...

Страница 75: ...WSHP SVX015C EN 75 N No ot te es s...

Страница 76: ...protect food and perishables and increase industrial productivity and efficiency We are a global business committed to a world of sustainable progress and enduring results ingersollrand com Ingersoll...

Отзывы: