Request for Initial Startup
AXM Air-to-Water Heat
Pump
As part of a continuous commitment to quality, initial startup
of this heat pump by a factory-certified technician may be
purchased from Trane. No initial startup will be scheduled
without a Request for Initial Startup form completed and on
file with the Trane customer service department.
Submitting this form indicates that all critical work
described on the form has been completed. To prevent
additional charges for aborted startups, the following items
must be completely functional and operating and this form
signed and returned to Trane at least 10 working days prior
to the scheduled initial startup date.
Heat Pump Initial Startup Data
Model Number:
Primary Module Serial Number:
Primary Contact Name:
Primary Contact Phone:
Primary Contact FAX:
Primary Contact Mobile:
Name of Heat Pump Site:
Physical Location of Heat Pump:
Requested Date for Initial Start-up:
Requested Time for Initial Start-up:
Mandatory Initial Startup Requirements
Mandatory Tasks
Date Completed
Initialed Complete
All heat pump modules are installed with minimum clearances available from all sides.
Refrigeration gauges are indicating equal pressures.
Chilled water lines from heat pump to customer’s equipment are permanently connected.
Chilled water lines have been flushed clean of mud, slag, and other construction debris.
All chilled water line filters and strainers are clean.
Chilled water lines have been leak tested according to prestart instructions.
Heat Pump reservoir (if included) is at operating level with correct water/glycol mixture.
High voltage wiring is installed, tested, and functional.
All water, refrigeration, electrical, and control connections between heat pump modules are completed.
All control wiring between modular heat pumps is installed, tested, and functional.
Control wiring is complete, including any remote interface panel or special-purpose module wiring.
Automatic City Water Switchover (if included) is installed, flushed, and leak-tested.
Condenser, if applicable, is installed, piped, wired, and leak-tested.
All responsible installing contractors and sub-contractors are notified to have representatives available
on site to provide technical support for the initial start-up procedure.
Full load shall be available for heat pump on the initial start-up date.