ARTC-SVX005B-EN
47
Heating Trend Screen
Use the left and right scrolling buttons to switch
between cooling trend and heating trend screens. The
heating trends screen is similar to the cooling trends
screen.
Figure 26.
Heat trend screen
Operator Tasks
Before operating the unit, ensure that all compressor
refrigeration service valves are fully back-seated
counterclockwise.
N
NO
OT
TIIC
CE
E
C
Co
om
mp
prre
esssso
orr D
Da
am
ma
ag
ge
e!!
F
Fa
aiillu
urre
e tto
o p
prro
op
pe
errlly
y b
ba
acckk--sse
ea
att rro
otta
allo
occkk v
va
allv
ve
ess cca
an
n
cca
au
usse
e cco
om
mp
prre
esssso
orr ffa
aiillu
urre
e..
V
Ve
erriiffy
y tth
he
e cciirrccu
uiitt b
brre
ea
akke
errss o
on
n tth
he
e m
mo
od
du
ulle
e e
elle
eccttrriicca
all
p
pa
an
ne
ell a
arre
e ttu
urrn
ne
ed
d tto
o O
OF
FF
F p
po
ossiittiio
on
n p
prriio
orr tto
o a
ap
pp
plly
yiin
ng
g
p
po
ow
we
err..
Normal Power Up
The following procedure is used for a startup resulting
from scheduled seasonal or programmed cold shut
down of the chiller/heater.
W
WA
AR
RN
NIIN
NG
G
H
Ha
azza
arrd
do
ou
uss V
Vo
olltta
ag
ge
e w
w//C
Ca
ap
pa
acciitto
orrss!!
F
Fa
aiillu
urre
e tto
o d
diisscco
on
nn
ne
ecctt p
po
ow
we
err a
an
nd
d d
diisscch
ha
arrg
ge
e
cca
ap
pa
acciitto
orrss b
be
effo
orre
e sse
errv
viicciin
ng
g cco
ou
ulld
d rre
essu
ulltt iin
n d
de
ea
atth
h o
orr
sse
erriio
ou
uss iin
njju
urry
y..
D
Diisscco
on
nn
ne
ecctt a
allll e
elle
eccttrriicc p
po
ow
we
err,, iin
nccllu
ud
diin
ng
g rre
em
mo
otte
e
d
diisscco
on
nn
ne
eccttss a
an
nd
d d
diisscch
ha
arrg
ge
e a
allll m
mo
otto
orr sstta
arrtt//rru
un
n
cca
ap
pa
acciitto
orrss b
be
effo
orre
e sse
errv
viicciin
ng
g.. F
Fo
ollllo
ow
w p
prro
op
pe
err
llo
occkko
ou
utt// tta
ag
go
ou
utt p
prro
occe
ed
du
urre
ess tto
o e
en
nssu
urre
e tth
he
e p
po
ow
we
err
cca
an
nn
no
ott b
be
e iin
na
ad
dv
ve
errtte
en
nttlly
y e
en
ne
errg
giizze
ed
d.. V
Ve
erriiffy
y w
wiitth
h a
a
C
CA
AT
T IIIIII o
orr IIV
V v
vo
ollttm
me
ette
err rra
atte
ed
d p
pe
err N
NF
FP
PA
A 7
70
0E
E tth
ha
att a
allll
cca
ap
pa
acciitto
orrss h
ha
av
ve
e d
diisscch
ha
arrg
ge
ed
d..
IIm
mp
po
orrtta
an
ntt:: This start-up procedure is not to be used for
the first-time initial startup for a newly
installed chiller. See Preparation for Initial
Startup in the Installation section of this
manual for instructions regarding that
situation.
1. De-energize the chiller/heater using standard
lockout/tagout procedures.
2. Using a known operational voltage meter, test and
confirm the chiller/heater is de-energized before
proceeding further.
3. Inspect power distribution fuses and overload
settings to verify they are correct.
4. Verify that the oil level is correct in each
compressor using the compressor sight glass.
Содержание Arctic PolyTherm TM Series
Страница 82: ...82 ARTC SVX005B EN N No ot te es s ...
Страница 83: ...ARTC SVX005B EN 83 N No ot te es s ...