8
18-AC126D1-1A-EN
Unit Preparation
1.
Check for damage and report promptly to the carrier any damage
found to the unit.
1.
To remove the unit from the pallet, remove wood screws from
mounting brackets.
Setting Up the Unit
Table 6. Pad Installation
When installing the unit on a support pad, such as a concrete slab,
consider the following:
•
The pad should be at least 1” larger than the unit on all sides.
•
The pad must be separate from any structure.
•
The pad must be level.
•
The pad should be high enough above grade to allow for drainage.
•
The pad location must comply with National, State, and Local
codes.
Important:
•
Unit can be secured to the pad if there is concern of the unit
tipping.
Note:
If using a stacking kit, follow stacking kit instructions.
Important: Heat Pump models should never be stacked!
Содержание 4TTL5024N1000A
Страница 27: ...18 AC126D1 1A EN 27 Wiring Diagrams Figure 4 2 0 2 5 and 3 0 Ton Models...
Страница 28: ...28 18 AC126D1 1A EN Figure 5 2 0 2 5 and 3 0 Ton Models W Wi ir ri in ng g D Di ia ag gr ra am ms s...
Страница 29: ...18 AC126D1 1A EN 29 Figure 6 3 5 and 4 0 Ton Models W Wi ir ri in ng g D Di ia ag gr ra am ms s...
Страница 30: ...30 18 AC126D1 1A EN Figure 7 3 5 and 4 0 Ton Models W Wi ir ri in ng g D Di ia ag gr ra am ms s...
Страница 34: ...34 18 AC126D1 1A EN N No ot te es s...
Страница 35: ...18 AC126D1 1A EN 35 N No ot te es s...