5
This
is given as a guide to good practices in the installation and operation of a
wall mounted split system models
and
Read these operation Instructions completely before installing the unit.
Reception
On arrival, inspect the unit before signing the delivery note. Specify any damage of the unit on
the delivery note, and send a registered letter of protest to the last carrier of the goods within 72
hours of delivery. Notify
the same time.
The unit should be totally inspected within 7 days of delivery. If any concealed damage is
discovered, send a registered letter of protest to the carrier within 7 days of delivery and notify
About the Unit
These units are assembled, pressure tested, dehydrated, charged and run tested before shipment.
This manual contains informations related to
Refrigerant
The refrigerant provided by the manufacturer comply with all the requirements for our units.
When using a recycled or reprocessed refrigerant, we recommend its qualities be as good as
those of a new refrigerant. It is necessary to have the refrigerant tested by a qualified laboratory.
Failure to do so could void the warranty.
Important
These instructions do not cover all variations in systems, nor do they provide for every possible
contingency to be met in connection with installation. Should further information be desired or
should particular problems arise which are not covered sufficiently in this manual, the matter
should be referred to your
General Information
4MYW
6
4TYK
6
4MYW
6
4TYK
6;
and
; 4MXW6 and 4TXK6. However it does not
contain all the service procedures for this unit, as these procedures must be performed by a qualified
service technician, through the maintenance contract with a reputable service company.
MS-SVN22A-EN
4MXW6 and 4TXK6
.
local sales office.
Installation Manual
your supplier at
the supplier.
Содержание 4MXW6-A
Страница 1: ... QVWDOOHU V 0DQXDO September 2013 06 691 1 16 SEER Inverter System 4 4MYW6 A 4MXW6 A 4TYK6 A 4TXK6 A ...
Страница 7: ... Sold Separately ...
Страница 27: ......