Installation
9.
The gas valve can now be opened. Open the gas valve by removing the shut-off valve cap
and turning the valve stem 1/4 turn counterclockwise using 1/4” Open End or Adjustable
wrench.
10. The gas valve is now open for refrigerant flow. If refrigerant lines are longer than fifteen feet
(8 m), it will be necessary to adjust system refrigerant charge upon completion of installation.
Outdoor condensation drainage (Heat pump type only)
When the unit is heating, the condensing water and defrosting water can be drained out reliably
through the drain hose.
Installation:
Install the outdoor drai
a 25mm hole on the base plate, and joint the drain hose to the
, so that the wastewater formed in the outdoor unit can be drained out to a proper place.
Figure 1.
Vacuum Pump and Leak inspection
kit
n kit in
kit
MS-SVN21A-EN
13
Содержание 2MCW0-G
Страница 6: ...RU 0 PRGHOV SRZHU LQSXW IURP LQGRRU XQLW 0 PRGHO SRZHU LQSXW IURP RXWGRRU XQLW MS SVN21A EN 6...
Страница 18: ...MS SVN21A EN Figure 4 2MWW0512G9 Heat pump indoor units Figure 5 2MCW0518G1 Cooling only indoor units 18...
Страница 21: ...06 691 1 LJXUH11 2TTK0518GB Cooling only outdoor units 10 2MWW0530G1 2MWW0530GB Heat pump indoor units 21...
Страница 26: ...20 2TWK0530G1 2TWK0530GB Heat pump Outdoor unit MS SVN21A EN Figure 21 2TWK0509GB Heat pump outdoor units 26...
Страница 27: ...06 691 1 LJXUH22 2TWK0512GB Heat pump outdoor units 27...