MS-SVN056C-EN
17
Cassette Unit Installation
Drain test
Verify the integrity of the drain pipe. In cases of new construction, we recommend testing the drain
before cementing the ceiling.
Units with water pump
1.
Remove the testing port cover and pour 2000ml of water in the drain pan.
2. Operate the unit in cooling mode. The operation of the pump will be heard during testing. Verify
that water drains correctly (1 minute delay, depending upon the length of the drain tube).
Confirm that all pipe fittings are leak-free.
3. Shut the unit down and replace the testing port cover.
<500mm
m
m
0
5
7
<
1-1.5m
Testing port cover
CLOSED
O
P
E
N
C
LO
S
E
D
OPEN
Water deposit
Body
Testing port
Pump connection
Testing port cover
Feeding tube (water)
Draining port cover
Inclination 1/50
Support bracket for pump tube
Содержание 2MCC05-C
Страница 24: ...24 MS SVN056C EN Concealed Unit Installation Performance Curves...
Страница 25: ...MS SVN056C EN 25 Concealed Unit Installation...
Страница 71: ...MS SVN056C EN 71 Wiring Diagrams Outdoor Unit Cooling Only 4TTK05 D 36K 3 Phase...
Страница 72: ...72 MS SVN056C EN Wiring Diagrams Outdoor Unit Cooling Only 4TTK05 D 48K 3 Phase...
Страница 73: ...MS SVN056C EN 73 Wiring Diagrams Outdoor Unit Cooling Only 4TTK05 D 60K 3 Phase...
Страница 74: ...74 MS SVN056C EN Wiring Diagrams Outdoor Unit Cooling Only Heat Pump 4TWK05 D 36K 3 Phase...
Страница 75: ...MS SVN056C EN 75 Wiring Diagrams Outdoor Unit Cooling Only Heat Pump 4TWK05 D 48K 3 Phase...
Страница 76: ...76 MS SVN056C EN Wiring Diagrams Outdoor Unit Cooling Only Heat Pump 4TWK05 D 60K 3 Phase...
Страница 78: ......
Страница 79: ......