Checklists
TR-Electronic GmbH 2022, All Rights Reserved
Printed in the Federal Republic of Germany
Page 32 of 35
TR-EMO-BA-GB-0023 v00
04/20/2022
10 Checklists
We recommend that you print out and work through the checklists during commissioning, during re-
placement of the encoTRive drive system, during replacement of system components or maintenance
of a previously accepted system and store these as part of the overall system documentation.
Documentation basis
Date
Edited
Checked
10.1 General
Sub-item
To note
Can be found under
yes
Present safety manual has
been read and understood
–
Document no.:
Check that the encoTRive
drive system can be used for
the present automation task
on the basis of the specified
safety requirements
● Intended use
● Compliance with all technical
data
● Chapter
Intended use, page 11
● Chapter
Document download
-> Product data sheets,
page 35
● Chapter
General technical data and in-
stallation
Supply voltage
● The power supply used must
satisfy the specified require-
ments
● Chapter
Correct
● electrical installation
(shielding)
● network installation
● Observance of basic rules for
installation
● Observance of wiring stand-
ards
● Observance of guidelines,
which are made available by
the respective fieldbus user
organizations
● Chapter
General technical data and in-
stallation
● Interface-specific user manual
see chapter
Document download,
page 35
● After commissioning
● When replacing compo-
nents of the system or
machine (e.g. connecting
cables, pushbuttons etc.)
● When replacing the enco-
TRive drive system
● Maintenance
● Validation of the overall sys-
tem or machine in respect of
the safety functions
● Validation of the encoTRive
safety functions
● The operator's system- or ma-
chine-specific checklist
● Checklist for validation of the
encoTRive safety functions,
page 33
● Chapter
● Chapter
● Chapter
Maintenance, page 34