Printed in the Federal Republic of Germany
TR-Electronic GmbH 2016, All Rights Reserved
09/20/2016
TR - ECE - TI - DGB - 0292 - 01
Page 123 of 159
The programming and modifications are now complete.
4.5 Compilation of the hardware and software project data
In order to load the project data into the F-CPU, the data must first be compiled.
During compilation the project data are converted so that they can be read by the F-
CPU.
To compile the hardware and software project data, first go to
Project tree
and in the directory tree select the entry
CD_75_-EPN_PROFIsafe -> PLC_1
[CPU 1511F-1 PN]
with the left mouse button.