F41519
Fulcrum
Length
SST
F41613
Fulcrum
Length
SST
F41496
–
POWER STEERING
RACK & PINION POWER STEERING GEAR ASSY
51–45
2312
Author:
Date:
2002 CAMRY REPAIR MANUAL (RM881U)
58.
INSTALL STEERING LEFT TURN PRESSURE TUBE
(a)
Coat 2 new O–rings with power steering fluid and install
them to the left turn pressure tube.
(b)
Using SST, install the left turn pressure tube to the rack
& pinion power steering gear assy.
SST
09023–38200
Torque: 11.5 N
⋅
m (117 kgf
⋅
cm, 8 ft
⋅
lbf)
HINT:
Use a torque wrench with a fulcrum length of 345 mm
(13.58 in.).
This torque value is effective in the case that SST is paral-
lel to a torque wrench.
59.
INSTALL STEERING RIGHT TURN PRESSURE TUBE
(a)
Coat 2 new O–rings with power steering fluid and install
them to the right turn pressure tube.
(b)
Using SST, install the right turn pressure tube to the rack
& pinion power steering gear assy.
SST
09023–38200
Torque: 11.5 N
⋅
m (117 kgf
⋅
cm, 8 ft
⋅
lbf)
HINT:
Use a torque wrench with a fulcrum length of 345 mm
(13.58 in.).
This torque value is effective in the case that SST is paral-
lel to a torque wrench.
60.
INSTALL POWER STEERING RACK HOUSING HEAT INSULATOR(1MZ–FE ENGINE TYPE)
(a)
Install power steering rack housing heat insulator.
HINT:
Install nut when installing the return tube clamp.
61.
INSTALL RACK & PINION POWER STEERING GEAR
ASSY
(a)
Install the rack & pinion power steering gear assy with the
2 bolts and nuts.
Torque: 70 N
⋅
m (714 kgf
⋅
cm, 52 ft
⋅
lbf)