FU-40
F U E L SYSTEM
-
Inj ection Pump
{bl Remove
the
four bolls, and separate t h e stopper
housing and boost compensator. Remove the O - ring
6 .
CHECK T H R U S T CLEARANCE O F F U L L STOP CAM
Using a feeler gauge. measure the thrust clearance bet
ween the lull slop cam and
NO. 2
adapter screw.
Thrust
clearance:
0.03 - 0.08
mm
(0_00 ' 2 - 0_0032
;n.1
I f the clearance is not within specification. replace the
thrust
washer.
Thrust washer thickness:
0 . 0 5
m m
(0.0020
in.)
0 . 1 0
m m
(0.0039
in.)
0.20
m m
(0.0079
in.)
7 .
DISASSEMBLE F U LL-LOAD STOPPER H O U S I N G
A S S E M B L Y
(2H Am
Disassemble t h e following pariS:
( 1 )
Two bolts
(2)
Cover plate
(3)
D-nng
(4)
Cap n u l and gasket
(5)
Lock nul and gasket
(6) Stopper screw
(7)
Screw plug
(8)
Sliding
plate
shaft
(91
Ful l - load sto pper housing and spnng
Содержание 12H-T
Страница 1: ...TOYOTA 2 H 1 2 H T ENGINE REPAIR MANUAL Nov 1985 ...
Страница 216: ...FU SS FUEL SYSTEM Injection Pump 20 wi PS OR A C INSTALL IDLE UP ACTUATOR ...
Страница 329: ...B 1 STA N DARD B O LT TO RQ U E S P EC I F ICAT I O N S Page STAN DARD BOLT TORQUE SPECIFICATIONS 8 2 ...
Страница 332: ...SST AND S S M SST ISPECIAl SERVICE TOOLS SSM ISPECIAl SE RVICE MATERIALS C l Page C 2 C 7 ...