Installation
TOX_Manual_Powerpackage_line-Q_en
37
6.3.6
Installing external power stroke release (ZKHF) and power
stroke deactivation (ZKHD)
Material required:
Electrical switching valve power stroke release (ZKHF) and power
stroke deactivation (ZKHD) with pneumatic OR valve
Installing the external power stroke release (ZKHF)
ü
For connections see External power stroke deactivation (assembly
ZKHD) (optional).
1.
Install switching valve power stroke release and power stroke deactiva-
tion with OR valve on control connection [14].
2.
Connect line of the control throttle 'X' to the OR valve.
3.
Connect pneumatic input [3] of the switching valve to compressed air
supply.
Installing the external power stroke deactivation (ZKHD)
ü
For connections see External power stroke deactivation (assembly
ZKHD) (optional).
1.
Install switching valve power stroke release and power stroke deactiva-
tion with OR valve on control connection [14].
2.
Connect line of the control throttle 'X' to the OR valve.
3.
Connect pneumatic input [1] of the switching valve to compressed air
supply.
Содержание Powerpackage Q Series
Страница 2: ...2 TOX_Manual_Powerpackage_line Q_en ...
Страница 24: ...Technical data 24 TOX_Manual_Powerpackage_line Q_en ...
Страница 54: ...Troubleshooting 54 TOX_Manual_Powerpackage_line Q_en ...
Страница 56: ...Maintenance table of Powerpackage 56 TOX_Manual_Powerpackage_line Q_en ...
Страница 66: ...Maintenance 66 TOX_Manual_Powerpackage_line Q_en ...
Страница 68: ...Repairs 68 TOX_Manual_Powerpackage_line Q_en ...
Страница 72: ...Disassembly and Disposal 72 TOX_Manual_Powerpackage_line Q_en ...
Страница 73: ...Appendices TOX_Manual_Powerpackage_line Q_en 73 13 Appendices 13 1 DECLARATION OF INCORPORATION ...
Страница 74: ...Appendices 74 TOX_Manual_Powerpackage_line Q_en ...
Страница 75: ......
Страница 76: ......