B
A
TSF-300A/300/120
CENTER HUNG PACKAGES
INSTALLATION INSTRUCTIONS
INSERT THE SPINDLE INTO
THE FLOOR HINGE.
1
4
5
2
3
PUT THE WASHER FIRST AND FIT END
SQUARED & ANGLED PART OF SPINDLE INTO
HOLLOW AREA AND TIGHTEN IT BY USE OF
SPINDLE SCREW READY ALREADY.
TURN THE ADJUSTMENT SCREW IN A
ANTICLOCKWISE AND RELEASE PIVOT PIN .
INSTALL THE PIVOT INTO UPPER PART OF DOOR
FRAME. AND COVER IT.
INSERT PIVOT CHANNEL INTO TOP OF DOOR,
INSTALL BEARING INSERT INTO PIVOT CHANNEL.
TIGHTEN UP THE ADJUSTMENT SCREW ALMOST
AND CONTROL THE CENTER POINT OF PIVOT.
FIX THE BEARING TO THE VERY PROPER
LOCATION.
INSTALL IN THE CENTER OF THE FLOOR HINGE
CEMENT BOX AND TIGHTEN THE FASTENING
SCREWS.
MAKE CEMENT BOX AND PUT THE FLOOR HINGE
IN THE CEMENT BOX.
THE UPPER PART OF THE CEMENT BOX SHOULD
BE ON THE LEVEL WITH THE FLOOR SURFACE.
THE CEMENT BOX SHOULD BE A LEVEL SURFACE.
ADDITIONALLY THE CENTER OF SPINDLE HAS TO BE
POSITED CORRECTLY.
FULFILL GROUT AROUND CEMENT BOX.
(LH Door) (RH Door)
CAUTION
-
PUT THE WASHER FIRST.
SPINDLE
SCREW
SPINDLE
WASHER
ADJUSTMENT SCREW
PIVOT
COVER PLATE
FOR SINGLE ACTION
OFFSET 3
°
.
FOR DOUBLE ACTION
STANDARD TYPE SPINDLE
FLOOR FINISHED
BEARING INSERT
ADJUSTMENT
SCREW
POIVOT CHANNEL
TOP PI
VO
T
CA
UTIO
N:
1.Dimension indica
ted is not a
rea
l size.
2.Dimensions a
re in mm.
3.A
ll reinforcement accesso
ries for bottom a
rm should be prepa
red by user.
34
25
18
32
Min 34
7
5
25
5
100
169
126
13
70
147
9
70
45
25
DOOR GAP 3
12.5
12.5
135
25
90
12
12
Holes for pivot insert x 4 ea
Use
Ø
5.1 drill for M
6 X 1.0 mech. Screw.
Holes x 5 ea
Use
Ø
4.3 drill for M5 x 0.8 mech. Screw.
REA
R view
Door fra
me position
Front
view
SI
DE view
PLA
NE VIEW
R65
DO
O
R a
rea
.
CO
VER PLA
TE
C/L
BO
TTOM
A
R
M
CA
UTI
O
N:
1,Dimension indica
ted is not a
rea
l size.
2,Dimensions a
re in mm.
3,A
ll reinforcement a
ccessories for bottom a
rm should be prepa
red by user.
Holes x 5 ea
Use
Ø
4.3 drill for M5 x 0.8 mech. Screw.
20
24
70
36
DOOR GAP 3
Floor area finished
59
40
52
52
52
201
Front view
Rea
r View
R65
C/L
FASTENING SCREWS