Toshiba TCB-PCIN2E Скачать руководство пользователя страница 1

Error output control board

(1) Be sure to turn off the power switch before installing.

(2) Place this P.C. board by using the support on the upper side of the electric

component box. There are four installation holes to place the support on the

upper side of the electric component box.

(3) Connect the P.C.board (TCB-PCIN2E)PJ20

and outdoor unit interface CN511

withconnection cable.

(4) Bind the remaining connection cable with the

attached banding band.

[ Outdoor unit interface PC board ]

Wiring

SN:CH49941101

INSTALLATION MANUAL

MODEL:TCB-PCIN2E

Feature

Operation  and  Error  monitoring  is  possible  by  using  Error  output
control board "TCB-PCIN2E"

Dimension

No.

1
2
3
4
5
6

Q’ty

1
4
2
1
1
2

Parts name

Connection cable
Support to fix the board
Earth screw
Wire-clamp
Screw for cable-clamp
Banding band

69

79

63

73

4-

φ

4 hole

Terminal(Screw M3)

Accesory parts

Placing position

TCB-PCIN2E 

Outdoor unit
interface PC board 

[ Outdoor unit ]         [ Electric component box ]

CN511

GREEN

How to install

Safety Precautions

WARNING

CAUTION

This symbol is used to identify action which, if carried out in an incorrect ignoring this indication, 
could lead to serious personal injury or even death.

Installation of accessory parts should be performed either by personnel from this dealer
where it was purchased or by specialist installation technicians.

Reassembling, repair, or modification of this accessory parts is strictry forbidden.

Do not install a location where flammable gasses may be present.

Repair of the accessory parts must also carried out by personnel from dealer where it was purcased.

Use the specified wires for wiring connect the terminals securely fix. To prevent external
forces applied to the terminals from affecting the terminals.

This symbol is used to identify action which, if carried out in an incorrect ignoring this indication, 
could lead to serious human injury or property damage.

 

 Please read this section carefully before installation work to install the accessory parts in the

  prescribed manner. The precaution given here deal with serious safety issues. It is, therefore,
  of the utmost importance that they are observed in full.

 

 The meanings of safety-related symbol are as follows:

 

 After installation work has been completed, perform a trial operation of the equipment in order

  to ensure that it is operating normally, and then hand over to the customer and ask to keep
  this Safety Precautions and Installation Instruction.

 

 Incorrect installation by unqualified personnel can result in electric shock, fire or abnormal operation.

 

 Fire may break out should flammable gas leak into the vicinity of the parts.

 

 Fire may break out should flammable gas leak into the vicinity of the parts.

 

 Failure to follow these directions can result in inflammation, earth leakage or abnormal operation

    causing electric shock or injury.

WARNING

Size(mm):H22 x L73 x W79
Weight(g):  57

Length

Shield wire

Type

Size

*

   In conformity with design 60245 IEC 57

Output wiring

Up to 200m

Up to 400m

4-core, 0.75mm

2

  

*

4-core, 1.5mm

2

  

*

(1) Refer to the "Electric wiring diagram" when wiring.

(2) Be sure to use the shield wire to prevent noise trouble, and perform the

grounding at both sides of shield wires.

(3) Fix the output wiring with the cable-clamp and banding band.

(3)-1. Let the output wiring into the banding band and band it together with the

other wiring.

(3)-2. Fix the wire-clamp using the screw hole on the "B" position.

[ Electric component box ]

A

B

Banding band

Wire-clamp

Output wiring

(Local supply)

Function  /  Electric wiring diagram

Operation monitoring : Display relay is ON with more than one indoor unit operation.
EMG monitoring : Display relay is ON when the system in error status.

I/F P.C. Board

*

*

Place this option P.C. Board to header outdoor unit.

Connection

Cable

Local Supply

 : Operation monitoring lamp

TCB-PCIN2E

Power Supply

OPERATION

PJ20

CN511

L1

L1

 : Error monitoring lamp

L2

Display
Relay

Power Supply

EMG

L2

Display
Relay

  

CAUTION)

 

  ・

Be sure to prepare a non-voltage point for each terminal.

 

  ・

Display Relay capacity of "OPERATION" and "EMG"

 

          Below AC240V 0.5A (COS

φ

=100%)

          When connecting load such as relay coil to "L1,L2" load, insert the noise surge absorber.

          Below DC24V 1A (Non-inductive load)

          When connecting load such as relay coil to "L1,L2" load, insert the bypass circuit.

Install this P.C. board to the upper side of the electric component box on outdoor unit.

Отзывы: