background image

  

 

This product specification is variable and subject to change prior to product launch. 

 

 

© Copyright 2007 – 2008 Toshiba America Information Systems Inc. All Rights reserved. 

TAIS shall not be liable for damages of any kind for use of this information, which is subject to change without notice. 

 

Satellite Pro S300-S2502 1.0 

Page 5 of 5 

                                                                                                                                                                                                                                                             

 
Internet access is required to enable certain functionality of certain Microsoft products(including Microsoft Office Small Business Accounting 2006) which may be included with this computer.
 
The Microsoft Office 2007 60-Day Trial software (if applicable) is intended for evaluation purposes only.  You must activate the software before you can use it.  Product activation 
procedures will be detailed during initial launch of the software; activation requires Internet access.  This software has an expiration date of 60 days from date of first use, at which 
time the software will operate under reduced-functionality mode, limiting end-user options and operations.  The Microsoft Office 2007 60-Day Trial software is distributed without 
charge to the End User Customer but if the End User wants to continue to use such product after the trial period, then the End User Customer will have to pay a fee for the 
perpetual version of such Office Product. 

 

21

 

Temperature (Environmental) Conditions

. All temperature references are approximate and the performance of your computer may vary from specifications even when 

operating within the recommended temperature range. 
 

22

 

RoHS.

  This notebook is compatible with European Union Directive 2002/95/EC, Restriction of the use of certain Hazardous Substances in electrical and electronic equipment 

(RoHS), which restricts use of lead, cadmium, mercury, hexavalent chromium, PBB, and PBDE. Toshiba requires its notebook component suppliers to meet RoHS requirements 
and verifies its suppliers' commitment to meeting RoHS requirements by conducting component sampling inspections during the product design approval process.

 

 

23

 

Warranty:

 The terms and conditions of Toshiba’s standard limited warranty are available at 

www.warranty.toshiba.com

 

24

 

Service Plans

: The terms and conditions of service upgrade and extension plans offered by Toshiba are available at 

www.pcsupport.toshiba.com

 

25

 

Service Plans

: The terms and conditions of service upgrade and extension plans offered by Toshiba are available at 

www.pcsupport.toshiba.com

 

Содержание Satellite Pro S300-EZ2502

Страница 1: ...eakers Sound volume control dial Built in microphone with Webcam Input Devices 86 key US keyboard TouchPad pointing device TouchPad Enable Disable Control Buttons o Toshiba Assist button to launch Toshiba Assist control panel o Windows Mobility Center button Communications Modem 10 Intel 82567V Gigabit Network Connection Integrated Wi Fi compliant wireless o Intel WiFi Link 5100AGN 11 Bluetooth ve...

Страница 2: ...her Depot Express or Carry In Express and go to the front of the line Extended Service Plan included except with 1 Year plan Must be purchased within the first 30 days of notebook purchase Part Number Description WSN PFGP2V 1st 2nd Year WSN PFGP3V 1st 2nd 3rd Year Extended Service Plan WSN PFGP4V 1st 2nd 3rd 4th Year Extended Service Plan SystemGuard Accidental Damage Service On Site Repair 25 Com...

Страница 3: ... of their respective owners C1 64 bit computing 64 bit computing requires that the following hardware and software requirements are met 64 bit Operating System 64 bit CPU Chipset and BIOS Basic Input Output System 64 bit Device drivers 64 bit applications Certain device drivers and or applications may not be compatible with a 64 bit CPU and therefore may not function properly A 32 bit version of t...

Страница 4: ...e screen technology When the computer is operated on battery power the screen with dim and you may not be able to increase the brightness of the screen while on battery power 9 Graphics Graphics Processing Unit GPU performance may vary depending on product model design configuration applications power management settings and features utilized GPU performance is only optimized when operating in AC ...

Страница 5: ...r but if the End User wants to continue to use such product after the trial period then the End User Customer will have to pay a fee for the perpetual version of such Office Product 21 Temperature Environmental Conditions All temperature references are approximate and the performance of your computer may vary from specifications even when operating within the recommended temperature range 22 RoHS ...

Отзывы: