
97
No.
Part name
Reactor
Pulse Modulating
Valve (PMV) coil
Procedure
1) Perform works of items
to
.
2) Take off screws fixing the reactor.
(Ø4 x 10L , 2 pcs. per one reactor.
An outdoor unit has two reactors on the
partition plate.)
1. Detachment
1) Perform works of items
to
.
2) Remove the coil from PMV body while
pulling it upward.
2. Attachment
1) Match the positioning extrusion of the coil
surely to the concavity of PMV body to fix it.
Remarks
Reactor
Partition plate
Screws
Positioning extrusion
PMV body
PMV coil
Concavity
Содержание RAV-SP1100AT-E
Страница 118: ......