– 150 –
Take off
earth screws.
Power line
Inverter box
(Metal sheet)
Control P.C.
board assembly
P.C. board base
Hooking claws
(4 positions)
Control P.C.
board assembly
P.C. board base
Inverter box
(Metal sheet)
Heat sink
No.
4
Part name
Control P.C.
board assembly
Procedure
1) Disconnect lead wires and connectors
connected from the control P.C. board
assembly to other parts.
1. Lead wires
• Connection with the power terminal
block: 3 wires (Black, White, Orange)
• Earth wire: 1 wire (Black)
2. Connectors
• Connection with compressor:
Remove 3P connector.
• Connection with reactor:
Remove the relay connectors from
P08, 11 (2P, White) and P30, 31
(2P, Yellow)
CN300 : Outdoor fan (3P, White)
CN701 : 4-way valve (3P, Yellow)
CN600 : TE sensor (2P, White)
CN601 : TD sensor (3P, White)
CN603 : TS sensor (3P, White)
CN602 : TO sensor (3P, White)
CN500 : Case thermo. (2P, White)
CN700 : PMV (6P, White)
2) Remove the inverter box (Metal plate).
3) Remove the control board assembly
from P.C. board base.
(Remove the heat sink and the control
board assembly as they are screwed.)
NOTES:
1. CN300 and CN701, etc. at the control
board assembly side are connectors with
locking function.
Therefore, remove the connector while
pushing the part indicated by an arrow
mark.
2. Remove 4 hooking claws of P.C. board
base, and remove upward the heat sink
with hands.
4) Take off 3 screws fixing the heat sink
and main control board assembly side,
and replace the board with a new one.
NOTE:
When mounting a new board, check that the
board is correctly set in the groove of the
base holder of P.C. board base.
Attach the P.C. board so that the heat sink
comes securely contact with the metal sheet.
Remarks