
– 15 –
2 . CONSTRUCTION VIEWS (EXTERNAL VIEWS)
RAV-SM1103AT-E1, RAV-SM1403AT-E1
365
17.5
17.5
21
21
40
70
29
90
191
20
40
39
47
43
43
95
600
150
60
26
Knockout
(For draining)
Knockout
(For draining)
Drain hole (Ø20 × 88 Burring hole)
Drain hole (Ø25 Burring hole)
Part A
Part B
(Long hole pitch
fo
r anchor bolt)
Suction
port
Suction
port
Discharge
port
Z
1
2
67
60
264
264
565
101
154
900
27
60
96
307
300
314
Handles
(Both sides)
Refrigerant pipe connecting port
Flare at liquid side : Ø9.5
Refrigerant pipe connecting port
Flare at gas side : Ø15.9
Discharge guide
mounting hole
(4-Ø4 Embossing)
1
1
2
2
795
89
165
60
80
25
60
90
320
28
400
161
58
46
25
50
27
Space required for service
365
600
2-Ø12 × 17 U-shape holes
(For Ø8–Ø10 Anchor bolt)
Suction port
Discharge
port
Discharge
port
(Minimum
distance up to wall)
2-Ø12 × 17 long hole
(For Ø8–Ø10 Anchor bolt)
500
or more
150
or more
150
or more
150 or more
58
7
86
7
Knockout for lower piping
Z views
17.5
40
40
17.5
Installation bolt hole
(Ø12 × 17 U-shape holes)
Installation bolt hole
(Ø12 × 17 U-shape holes)
Details of B part
Details of A part
Содержание RAV-SM1103AT-E1
Страница 19: ... 19 4 WIRING DIAGRAM ...
Страница 90: ... 90 14 EXPLODED VIEWS AND PARTS LIST ...