
111
(9)
Electronic
expansion valve
coil
1. Detachment
1) Following to work of Detachment of (2), (3) and (5).
2) Remove the coil by pulling it up from the electronic
control valve body.
2. Attachment
1) When assembling the coil into the valve body,
ensure that the coil anti-turn lock is installed
properly in the pipe.
<Handling precaution>
When handling the parts, do not pull the lead wires.
When removing the coil from the valve body, use your
hand to secure the body in order to prevent the pipe from
being bent out of shape.
(10) Fan guard
1. Detachment
1) Following to work of Detachment of (2).
2) Remove the front cabinet, and put it down so that
fan guard side directs downward.
NOTE
Perform work on a corrugated cardboard, cloth, etc. to
prevent flaw to the product.
3) Remove the hooking claws by pushing minus
screwdriver according to the arrow mark in the right
figure, and remove the fan guard.
2. Attachment
1) Insert claws of the fan guard in the holes of the front
cabinet. Push the hooking claws (9 positions) by
hands and fix the claws.
NOTE
Check that all the hooking claws are fixed to the
specified positions. (Push the fan guard in the direction
of outside toward center and check that the hooking
claws have fallen.)
No.
Part name
Procedure
Remarks
Correct
Correct
Incorrect
Incorrect
Claw
Claw
Claw
Claw
Claw
Claw
Claw
Claw
Claw
Claw
Claw
Claw
Claw
Claw
Claw
Claw
Claw
Claw
Minus
screwdriver
Minus
screwdriver
Minus
screwdriver
Front cabinet
Front cabinet
Front cabinet
Claw
Claw
Claw