
No. Part name
Procedure
Remarks
High pressure 1.Detachment
switch
1) Perform work of
①
.
2) Recover the refrigerant gas form the outdoor unit.
3) Perform work of
②
,
③
,
④
and
⑤
.
4) Remove the sound-insulation material and partition.
5) Remove the high pressure switch by the burner.
Take care that the electric parts,
butyle, compressor, accum tank, heat exchanger,
and etc. are not caught by flame.
(Otherwise pperation trouble may occur.)
1.Attachment
・
Be sure not to burn lead wire of the high pressure
switch.
Adjust the temperature of the hight pressure
switch to below 100
º
C
during the brazing.
Use
the wet towel for cooling.
Use the protective plate for the brazing.
⑬
Wet towel
Protective plate
Hi gh pressure switch
14
Screw
Plate Fix
Packed-Valve
& Body-PMV
1)
Perform works from
①
to
⑤
.
2)
Recover the refrigerant gas fr
o
m the outdoor unit.
3)
Remove
screw 2p
c
s
.
(ST1TØ4×10L)
from Plate
f
ix
Packed-Valve
4)
Remove
Plate fix Packed-Valve by brazing 2 point
s
.
•
Take care to keep the PMV, coil-PMV, and
Packed-Valve away naked flames.
Brazing 2 points
- 87 -
Содержание RAS-2M21U2ACVG-SG
Страница 24: ...Outdoor Unit 4 CONSTRUCTION VIEWS Unit mm RAS 3M31U2ACVG SG RAS 3M41U2ACVG SG RAS 2M21U2ACVG SG 24 ...
Страница 25: ...5 WIRING DIAGRAM Outdoor Unit RAS 2M21U2ACVG SG t t t t t t 25 ...
Страница 91: ...144 9 MOO 5 BANGKADI INDUSTRIAL PARK TIVANON ROAD TAMBOL BANGKADI AMPHUR MUANG PATHUMTHANI 12000 THAILAND ...