Startup and Test
Before turning on the ASD, ensure that:
•
R/L1
,
S/L2
, and
T/L3
are connected to the 3-phase input power.
•
U/T1
,
V/T2
, and
W/T3
are connected to the motor.
• The 3-phase input voltage is within the specified tolerance.
• There are no shorts and all grounds are secured.
• All personnel are at a safe distance from the motor and the motor-driven equipment.
Use the following table to record any changed parameters for future reference.
Table 3. ASD Parameter Changes by Installer/Maintenance Personnel.
ASD ID__________Name:______________________Date:_______
Notes
Parameter
Number
Parameter Name
Default or
Previous
Setting
New Setting
Unit of
Measure
Note:
Settings may also be recorded via Program
Utilities
Type Reset
DANGER
Содержание P9
Страница 1: ...TM P9 ASD Install Op Manual TOSHIBA P9 ASD INSTALLATION OPERATION MANUAL DN 64054 004 February 2013 ...
Страница 2: ......
Страница 3: ...Document Number 64054 004 February 2013 P9 ASD Installation Operation Manual TM ...
Страница 4: ......
Страница 280: ...270 P9 ASD Installation and Operation Manual Figure 38 See Tables 17 and 18 for Actual Dimensions ...
Страница 281: ...P9 ASD Installation and Operation Manual 271 Figure 39 See Tables 17 and 18 for Actual Dimensions ...
Страница 282: ...272 P9 ASD Installation and Operation Manual Figure 40 See Tables 17 and 18 for Actual Dimensions ...
Страница 285: ...P9 ASD Installation and Operation Manual 275 Figure 43 See Table 18 for the associated device Dimensions are in in cm ...
Страница 304: ...294 P9 ASD Installation and Operation Manual W W T3 16 Warranty Card 2 W Phase Over Current 265 ...
Страница 305: ......