P9 ASD Installation and Operation Manual
9
Operational and Maintenance
Precautions
•
Turn off and lock-out/tag-out the main power, the control power, and instrumentation connections
before inspecting or servicing the ASD, removing any enclosure panels, or connecting/
disconnecting the power wiring to the equipment.
•
Turn the power on only after attaching (or closing) the front cover.
DO NOT
remove or open the
front cover or any of the enclosure panels of the ASD during normal ASD operation.
•
During system setup, calibration, testing, or troubleshooting, it may be required to access live
circuits.
DO NOT
leave the system unattended and powered with the door(s) and/or covers
removed.
•
If/when taking a live reading is required (equipment is powered), it is to be performed by Qualified
Personnel
ONLY
. Proper and approved personal protection equipment is to be used by trained
personnel for all electrical measurements.
•
The capacitors of the ASD maintain a residual charge for a period of time after the ASD is powered
off. The required time for each ASD typeform is indicated with a cabinet label and a
Charge
Indicator LED
). Wait at least the minimum time
indicated on the enclosure-mounted label and ensure that the
Charge Indicator LED
has turned
off once the ASD power has been turned off before coming into contact with any circuits.
•
DO NOT
attempt to disassemble, modify, or repair the ASD. Call the TIC Customer Support
Center for repair information.
•
DO NOT
place any objects inside of the ASD.
•
If the ASD should emit smoke, or an unusual odor or sound, turn off the power immediately.
•
The heat sink and other components may become extremely hot to the touch. Allow the unit to cool
before coming into contact with these items.
•
The
Auto Start-Stop
and the
Sleep Timer
programmable functions of the ASD may allow for the
system to start or stop unexpectedly. Warning signs to this effect must be clearly posted at or near
the machinery/hazard.
•
Remove power from the ASD during extended periods of non-use.
•
Inspect the system annually (as a minimum) for damaged or improperly functioning parts,
cleanliness, and to ensure that the connectors are tightened securely. Inspect more frequently when
operating in a harsh environment or when used on a high-output-demand application.
DANGER
Содержание P9
Страница 1: ...TM P9 ASD Install Op Manual TOSHIBA P9 ASD INSTALLATION OPERATION MANUAL DN 64054 004 February 2013 ...
Страница 2: ......
Страница 3: ...Document Number 64054 004 February 2013 P9 ASD Installation Operation Manual TM ...
Страница 4: ......
Страница 280: ...270 P9 ASD Installation and Operation Manual Figure 38 See Tables 17 and 18 for Actual Dimensions ...
Страница 281: ...P9 ASD Installation and Operation Manual 271 Figure 39 See Tables 17 and 18 for Actual Dimensions ...
Страница 282: ...272 P9 ASD Installation and Operation Manual Figure 40 See Tables 17 and 18 for Actual Dimensions ...
Страница 285: ...P9 ASD Installation and Operation Manual 275 Figure 43 See Table 18 for the associated device Dimensions are in in cm ...
Страница 304: ...294 P9 ASD Installation and Operation Manual W W T3 16 Warranty Card 2 W Phase Over Current 265 ...
Страница 305: ......