6.6 Conjunctive Tests
6.6.1 On Load Test
With the relay connected to the line which is carrying a load current, it is possible to check the
polarity of the voltage transformer and current transformer and the phase rotation with the
metering displays on the LCD screen.
Open the following "Metering" screen from the "Status" sub-menu.
I c 1
.
k A
.
I c 2
.
k A
.
I b 1
.
k A
.
I b 2
.
k A
.
I a 1
.
k A
.
I a 2
.
k A
.
/ 2 M e t e r i n g 1 6 / O c t / 1 9 9 7 1 8 : 1 3 3 / 2 0
I n 1
.
k A
.
I n 2
.
k A
.
I 0 1
.
k A
.
I 0 2
.
k A
.
I 2 1
.
k A
.
I 2 2
.
k A
.
I 1 1
.
k A
.
I 1 2
.
k A
.
I 1 3
.
k A
.
I c 3
.
k A
.
I b 3
.
k A
.
I a 3
.
k A
.
I d a
.
p u I d 0 1
.
p u
V
.
k V
.
I n 3
.
k A
.
I 0 3
.
k A
.
I 2 3
.
k A
.
F r e q u e n c y
.
H z
I d c
.
p u I d 0 3
.
p u
I d b
.
p u I d 0 2
.
p u
T H M
.
%
Note:
The magnitude of voltage and current can be set in values on the primary side or on the
secondary side by the setting. (The default setting is the primary side.)
Phase angles are expressed taking that of the voltage input as the reference angle.
Check that the phase rotation is correct.
Verify the phase relation between voltage and current with a known load current direction.
6.6.2 Tripping Circuit Test
The tripping circuit including the circuit breaker is checked by forcibly operating the output relay
and monitoring the breaker that is tripped. Forcible operation of the output relay is performed on
the "Binary output" screen of the "Test" sub-menu as described in Section 6.4.3.
Tripping circuit
Set the breaker to be closed.
Press 2 (= Binary output) on the "Test" sub-menu screen to display the "Binary output"
screen. The LCD displays the output modules mounted.
Enter 1 to select the IO1 module, then the LCD displays the screen shown below.
Содержание GRT100 Series
Страница 55: ... 54 6 F 2 S 0 7 8 9 TRANSFORMER PROTECTION GRT100 Operation keys 101B 21 11 Figure 3 1 9 Front Panel ...
Страница 142: ... 141 6 F 2 S 0 7 8 9 Appendix A Block Diagram ...
Страница 144: ... 143 6 F 2 S 0 7 8 9 Appendix B Signal List ...
Страница 159: ... 158 6 F 2 S 0 7 8 9 ...
Страница 160: ... 159 6 F 2 S 0 7 8 9 Appendix C Variable Timer List ...
Страница 162: ... 161 6 F 2 S 0 7 8 9 Appendix D Binary Output Default Setting List ...
Страница 165: ... 164 6 F 2 S 0 7 8 9 ...
Страница 166: ... 165 6 F 2 S 0 7 8 9 Appendix E Details of Relay Menu and LCD and Button Operation ...
Страница 174: ... 173 6 F 2 S 0 7 8 9 Appendix F Case Outline Flush Mount Type Rack Mount Type ...
Страница 179: ... 178 6 F 2 S 0 7 8 9 ...
Страница 180: ... 179 6 F 2 S 0 7 8 9 Appendix G External Connections ...
Страница 185: ... 184 6 F 2 S 0 7 8 9 ...
Страница 200: ... 199 6 F 2 S 0 7 8 9 ...
Страница 201: ... 200 6 F 2 S 0 7 8 9 Appendix J Return Repair Form ...
Страница 205: ... 204 6 F 2 S 0 7 8 9 Customer Name Company Name Address Telephone No Facsimile No Signature ...
Страница 206: ... 205 6 F 2 S 0 7 8 9 ...
Страница 207: ... 206 6 F 2 S 0 7 8 9 Appendix K Technical Data ...
Страница 220: ... 219 6 F 2 S 0 7 8 9 ...
Страница 221: ... 220 6 F 2 S 0 7 8 9 Appendix M Symbols Used in Scheme Logic ...
Страница 224: ... 223 6 F 2 S 0 7 8 9 ...
Страница 225: ... 224 6 F 2 S 0 7 8 9 Appendix N Implementation of Thermal Model to IEC60255 8 ...
Страница 228: ... 227 6 F 2 S 0 7 8 9 ...
Страница 229: ... 228 6 F 2 S 0 7 8 9 Appendix O IEC60870 5 103 Interoperability and Troubleshooting ...
Страница 241: ... 240 6 F 2 S 0 7 8 9 Appendix P Modbus Interoperability ...
Страница 255: ... 254 6 F 2 S 0 7 8 9 ...
Страница 256: ... 255 6 F 2 S 0 7 8 9 Appendix Q Inverse Time Characteristics ...
Страница 259: ... 258 6 F 2 S 0 7 8 9 ...
Страница 260: ... 259 6 F 2 S 0 7 8 9 Appendix R Failed Module Tracing and Replacement ...
Страница 266: ... 265 6 F 2 S 0 7 8 9 Appendix S Ordering ...
Страница 269: ... 268 6 F 2 S 0 7 8 9 3 1 Oct 2 2017 Republished under spin off company ...
Страница 270: ......