7. Putting Unit into Service
The following procedure must be adhered to when putting the relay into service after finishing
commissioning or maintenance tests.
Check that all external connections are correct.
Check the setting of all elements, recordings and clock are correct.
In particular, when settings are changed temporarily for testing, be sure to restore them.
Clear any unnecessary records on events which are recorded during the tests.
Check that the green "IN SERVICE" LED is lit and no other LEDs are lit on the front panel.
Содержание G1IF4
Страница 29: ... 28 6 F 2 S 0 8 7 7 4 2 9 Active group Active group Group 1 fixed ...
Страница 34: ... 33 6 F 2 S 0 8 7 7 IFU side setting ...
Страница 35: ... 34 6 F 2 S 0 8 7 7 And then check the connecting status by RSM100 ...
Страница 48: ... 47 6 F 2 S 0 8 7 7 Appendix A External Connections ...
Страница 50: ... 49 6 F 2 S 0 8 7 7 Appendix B Outline Diagram ...
Страница 52: ... 51 6 F 2 S 0 8 7 7 Appendix C Signal List ...
Страница 103: ... 102 6 F 2 S 0 8 7 7 ...
Страница 104: ... 103 6 F 2 S 0 8 7 7 Appendix D Setting Sheet 1 Relay Unit Identification 2 Default setting ...
Страница 118: ... 117 6 F 2 S 0 8 7 7 Appendix E Return Repair Form ...
Страница 121: ... 120 6 F 2 S 0 8 7 7 ...
Страница 122: ... 121 6 F 2 S 0 8 7 7 Appendix F Technical Data ...
Страница 125: ... 124 6 F 2 S 0 8 7 7 ...
Страница 126: ... 125 6 F 2 S 0 8 7 7 Appendix G Ordering ...
Страница 129: ......