
8
© 2015 TOSHIBA TEC CORPORATION All rights reserved
e-STUDIO2008A/2508A/3008A/3508A/4508A/5008A
ERROR CODE AND TROUBLESHOOTING
8 - 117
[ 5 ] Paper jam in finisher section
[EA10] Paper transport delay jam
MJ-1101/1107
[EA10] Transport delay jam (paper not inserted)
MJ-1106/1108
Classification
Error content
Paper jam in finisher section
Paper transport delay jam
Check item
Measures
Removing paper
Check if there is any paper in the finisher or on the transport path of
the equipment and remove it if there is.
Entrance sensor
Is there a disconnection of the connector, incorrect installation or
breakage of the entrance sensor (S1)?
Gate solenoid
•
Is the gap between the flapper and entrance roller shaft other
than 0.60
0.20mm when the gate solenoid (SOL2) is pulled?
•
Is the harness between the gate solenoid (SOL2) and the
finisher control PC board (CN22) disconnected or open
circuited?
Entrance motor
Is the harness between the entrance motor (M1) and the finisher
control PC board (CN7) disconnected or open circuited?
Harness check
Is the harness between the gate solenoid (SOL2) and the finisher
control PC board (CN22) disconnected or open circuited?
Parts to be replaced
Remark
Entrance sensor
Finisher controller PC board
Classification
Error content
Paper jam in finisher section
Transport delay jam (paper not inserted)
Check item
Measures
Removing paper
Check if there is any paper in the finisher or on the transport path of
the equipment and remove it if there is.
Feeding sensor (S22)
Check if there is a disconnection of the connector, incorrect
installation or breakage of the feeding sensor (S22). If there is,
reinstall the sensor correctly or replace it.
Transport path switching
solenoid (SOL5)
Check that the gap between the transfer guide surface and the
upper surface of the flapper tip is in the acceptable range according
to the status of the transport path switching solenoid (SOL5)
(solenoid OFF: 1.5 to 2.1 mm, solenoid ON: 2.3 to 2.9 mm). If it is
not, adjust it.
Entrance motor (M1)
Check the harness between the entrance motor (M1) and the
finisher controller board (CN26). If there is any abnormality, correct
it.
Interface PC board (I/F)
Check the harness between the transport path switching solenoid
(SOL5) and the interface PC board (CN6), If there is any
abnormality, correct it.
•
Board check
•
Connector check (CN5, CN6, CN7)
•
Harness check
Содержание E-STUDIO2008A
Страница 7: ......
Страница 24: ...e STUDIO2008A 2508A 3008A 3508A 4508A 5008A 2015 TOSHIBA TEC CORPORATION All rights reserved CONTENTS 12 ...
Страница 26: ...e STUDIO2008A 2508A 3008A 3508A 4508A 5008A 2015 TOSHIBA TEC CORPORATION All rights reserved FEATURES 1 2 ...
Страница 384: ...e STUDIO2008A 2508A 3008A 3508A 4508A 5008A 2015 TOSHIBA TEC CORPORATION All rights reserved SELF DIAGNOSTIC MODE 5 66 ...
Страница 484: ...e STUDIO2008A 2508A 3008A 3508A 4508A 5008A 2015 TOSHIBA TEC CORPORATION All rights reserved SETTING ADJUSTMENT 6 100 ...
Страница 988: ...e STUDIO2008A 2508A 3008A 3508A 4508A 5008A 2015 TOSHIBA TEC CORPORATION All rights reserved FIRMWARE UPDATING 11 28 ...
Страница 1002: ...e STUDIO2008A 2508A 3008A 3508A 4508A 5008A 2015 TOSHIBA TEC CORPORATION All rights reserved BACKUP FUNCTION 12 14 ...
Страница 1008: ...e STUDIO2008A 2508A 3008A 3508A 4508A 5008A 2015 TOSHIBA TEC CORPORATION All rights reserved EXTERNAL COUNTERS 13 6 ...
Страница 1015: ......
Страница 1016: ...1 11 1 OSAKI SHINAGAWA KU TOKYO 141 8562 JAPAN ...