87
Deutsch
English
• Maintenance must be performed by qualified personnel only.
Please contact Torqeedo Service.
• If the instructions in chapter 7.1 and 7.3 are not adhered to, the main-
tenance intervals should be shortened.
Service actions
Component
Action
Service intervall
O-ring seals (gasket
rings)
Replace O-rings and shaft seals
After every 5 years or
after every 700 operating hours
(whichever comes first)
Propeller shaft
Visual inspection
Patch cables, plugs and
sockets
Visual inspection
Battery cable
Visual inspection
Power connector
Visual inspection
Anodes
Visual inspection
Change every 6 months
7.6 Trailering boats equipped with Cruise FP
Be sure to understand and adhere to all local and country-specific regulations regarding
the trailering of boats.
• Make sure before starting your journey and during your journey
that there is no risk of ground contact of the motor.
Содержание Cruise 2.0 FP
Страница 2: ......
Страница 45: ...45 Deutsch English...
Страница 46: ...46 Deutsch English...
Страница 47: ...47 Deutsch English...
Страница 50: ...50...
Страница 93: ...93 Deutsch English...
Страница 95: ......