Setup
Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
Description
Qty.
Use
1
No parts required
–
Check the fluid levels.
Lift chain
7
Chain bracket
7
U-bolt
7
Nut
14
Screw
7
Washer
7
Nut
7
Large O-ring
7
2
Kickstand
1
Install the cutting units.
3
No parts required
–
Make cutting unit adjustments if needed.
Calcium chloride (obtain separately)
45 kg
(100 lb)
4
Rear weight kit, part number 104-1478
(obtain separately)
1
Add rear ballast (if required).
Warning decal
1
CE decal
1
5
Year of production decal
1
Apply the CE decals.
Media and Additional Parts
Description
Qty.
Use
Operator's Manual
1
Read the manual before operating the machine.
Engine owner's manual
1
Read the manual before operating the engine.
Declaration of Conformity
1
This document indicates CE compliance.
Diagnostic ACE display overlay
1
The diagnostic ACE display overlay is for diagnosing
machine malfunctions.
Key
2
Use the keys to start the machine.
Hood lock key
1
Use the hood lock key to lock and unlock the hood.
Note:
Determine the left and right sides of the machine from the normal operating position.
11