Setup
Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
Description
Qty.
Use
1
No parts required
–
Remove the aerator from the crating.
Hitch pin
2
2
Lynch pin
2
Connect the lower link arms (the SR54
and SR54-S aerators ship with the hitch
pins and lynch pins installed).
Hydraulic top link
1
Hydraulic hose—106 cm (3-1/2 ft)
1
Hydraulic hose—76 cm (2-1/2 ft)
1
Extension bracket
2
Rotational bracket
1
3
Hose quick couplings
2
Connect the hydraulic top link (Models
SR54, SR70, and SR72).
Depth gauge
1
Slide block
1
Machine screw (#10 x 1/2 inch)
2
Screw (1/4 x 2-1/2 inch)
2
Tube clamp
1
Weld plate
1
4
Depth decal
1
Install the depth gauge.
Spring-loaded top link
1
Link pin
3
5
Lynch pin
3
Connect the upper link (Models SR54-S
and SR70-S).
6
No parts required
–
Verify the top link setup.
7
No parts required
–
Check the PTO angle.
8
PTO shaft
1
Fit the PTO shaft.
9
PTO shield
1
Install the PTO shield.
Pin (supplied with the PTO shaft)
1
10
Nut (supplied with the PTO shaft)
1
Connect the PTO shaft.
11
No parts required
–
Adjust the sway links.
12
Level (not supplied)
1
Level the aerator side-to-side.
13
Tines (as required)
–
Install the tines.
14
No parts required
–
Set the tine depth.
Rear guard
1
Screw (3/8 x 3-1/4 inch)
4
Flat washer (0.438 x 1 inch)
12
Locknut
4
15
End cap
2
Install the rear guard.
7