1. Locate, mark and drill a .281 inch diameter hole in
the front wall of the cab as shown in Figure 71. The
hole is to be located approximately in the center of
the cab wall (side to side and up and down)
Note:
Hole may already be present in the front
wall of the cab.
Figure 71
1.
.281 inch diameter hole location (Between pedals)
2. From the front of the cab, install the eyelet and
spacer to the cab wall with a flange nut (Figure 72).
Figure 72
1.
Eyelet
3.
Hole in cab wall
2.
Spacer
4.
Flange nut
3. Route the snowthrower wires from the cab, thru the
eyelet and to the snowthrower.
Winter to Summer Conversion
1. Start the machine and remove any attachments.
Position the machine so the winter frame can be
rolled away and replaced with the summer frame
and the rear of the machine can be raised with
a floor jack. (Cab door and side window can be
removed if space is limited). Store the attachment
per the instructions in the manufacturers
Operator’s
Manual
.
2. Make sure the lift arm A-frame is lowered all the
way.
3. Remove the two capscrews securing the floor plate
cover and remove the cover (Figure 73).
Figure 73
1.
Floor plate cover
2.
Mounting screws
4. Remove the roll pin and loosen the two capscrews
securing the drive shaft to the gearbox shaft
(Figure 74). Slide the drive shaft off the gearbox
shaft.
Figure 74
1.
Pressure hose
4.
Cable tie
2.
Tank hose
5.
Bolts
3.
Hose cover
6.
Roll pin
5. Position two jack stands under the rear bumper tube
at a height so that they contact or nearly contact
the bumper.
29