Содержание RAPTOR RP Series
Страница 1: ...Repair Instructions 2nd Stage Raptor Replacement...
Страница 2: ...Tools required 3 16 inch allen wrench pliers bin for balls...
Страница 3: ...Remove ball plug with allen wrench...
Страница 4: ...Showing plug removed...
Страница 5: ...Place Raptor over bin so balls will drop into bin...
Страница 6: ...Write here Rotate annulus alternately counter clockwise allowing balls to drop out...
Страница 7: ...G Raptor_BreakApart expor Raptor_Asse mble 10 jpg Write here Showing a ball dropping out...
Страница 8: ...Write here Continue turning until all balls are out and annulus comes from motor...
Страница 9: ...Write here Pull apart gearbox from motor and check to ensure gears are in gear housing as shown...
Страница 10: ...Write here Use socket to position gearbox vertically for stability...
Страница 11: ...Write here Stable gearbox positioned...
Страница 12: ...Write here Use pliers to remove 1st stage gears keep components on a clean surface...
Страница 13: ...Write here Remove 2nd gear...
Страница 14: ...Write here All gears removed...
Страница 15: ...Write here Remove 1st stage carrier keep components on a clean surface...
Страница 16: ...Write here Remove all three 2nd stage gears...
Страница 17: ...Write here Remove 2nd stage carrier...
Страница 18: ...Write here Old 2nd stage carrier on right new carrier shown on left...
Страница 19: ...Write here Lubricate new 2nd stage carrier with Mobil synthetic grease...
Страница 20: ...Write here Lubricate liberally as shown...
Страница 21: ...Lubricate pins on carrier...
Страница 22: ...Install new 2nd stage carrier...
Страница 23: ...Firmly press down on carrier to ensure proper fit Gear box should rotate freely on socket...
Страница 24: ...Reinstall gears onto on 2nd stage...
Страница 25: ...Reinstall gear...
Страница 26: ...Reinstall gear...
Страница 27: ...Showing completed 2nd stage assembly...
Страница 28: ...Install 1st stage carrier...
Страница 29: ...Ensure 1st stage carrier is completely installed...
Страница 30: ...Install 1st stage gears...
Страница 31: ...Install 1st stage gears...
Страница 32: ...Install 1st stage gears...
Страница 33: ...Align motor and gear box...
Страница 34: ...Showing properly aligned motor and gearbox...
Страница 35: ...Turn sideways to expose hole for balls...
Страница 36: ...Install 1st ball making sure ball drops completely into baring race...
Страница 38: ...Optional ball bearing assembly tool shown here but not required...
Страница 39: ...After installing all balls number of approx balls is 35 Gearbox should rotate freely of motor...
Страница 40: ...Reinstall ball plug using an allen wrench...
Страница 41: ...Completed 2nd stage replacement...