12
5.
Loosen the plastic port plugs and extend the cylinder to line up the hole in the intermediate
frame and the cylinder.
6.
Install B10 from the rear of the sprayer through the intermediate frame and the cylinder
adding a mounting plate between both sides of the cylinder and the frame. Add the final
plate to the front side of the intermediate frame.
Figure 12: Upper Pin Installation
7.
Using the 3/8” drill bit (M10), center the rear plate and pin on the intermediate frame. Drill
through the frame plate from the rear. Clamp the plate in place if desired.
8.
After drilling through the first flange of the intermediate frame, align the mounting plates
and slide the drill through all 3 plates to guide and drill through the second flange.
Figure 13: Drilling the Flanges
9.
Deburr the holes. Install the mounting bolts into the holes and snug. Drill the second set of
holes and install the mounting bolts. Torque the bolts to 20 ft-lbs (27 Nm).
Figure 14: Upper Pin Installed
Содержание NORAC UC4.5
Страница 1: ...Active Roll ControlTM Option Installation Manual...
Страница 5: ...2 2 Kit Parts 2 1 Kit Overview Figure 1 Roll Control Parts...
Страница 6: ...3 2 2 Hydraulic Plumbing Figure 2 Roll Control Hydraulic Plumbing...
Страница 11: ...8 Figure 7 Center Mark Location Centerline Mark 4 100mm...
Страница 21: ...18 8 Cable Drawings 8 1 ITEM C07 43220 0 5 CABLE UC5 NETWORK 14 AWG 0 5M...
Страница 22: ...19 8 2 ITEM C70 44658 46D CABLE UC4 VALVE DT ROLL WITH PIGTAIL...