11
4.3
Roll Cylinder Installation
1.
Remove the link arm (black square tube) connected between the parallel lift frame and roll
frame. See
Figure 10
for the link arm location.
Figure 10: John Deere Link Arm Location (looking towards rear of sprayer)
2.
Remove the lower link bolt and nut.
3.
Roll the intermediate frame (where the link is still attached) counterclockwise until the
upper link pin can be accessed. It may be helpful to use a jack or strap between the boom
frame and the intermediate frame. Remove the snap-ring from the link pin. Remove the
pin and link.
4.
Install the cylinder (H75) into the lower mount so that the cylinder ports face the front of
the sprayer. Ensure the pivot sleeve is installed into the cylinder. Install the bolt through
the cylinder and sleeve and torque to 250 ft-lbs (339 Nm).
Figure 11: Lower Bolt Installation
Link Arm
Position
Содержание NORAC UC4.5
Страница 1: ...Active Roll ControlTM Option Installation Manual...
Страница 5: ...2 2 Kit Parts 2 1 Kit Overview Figure 1 Roll Control Parts...
Страница 6: ...3 2 2 Hydraulic Plumbing Figure 2 Roll Control Hydraulic Plumbing...
Страница 11: ...8 Figure 7 Center Mark Location Centerline Mark 4 100mm...
Страница 21: ...18 8 Cable Drawings 8 1 ITEM C07 43220 0 5 CABLE UC5 NETWORK 14 AWG 0 5M...
Страница 22: ...19 8 2 ITEM C70 44658 46D CABLE UC4 VALVE DT ROLL WITH PIGTAIL...