![Topcon LN-100 Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/topcon/ln-100/ln-100_instruction-manual_1128569020.webp)
17
5. PREPARATION
Power ON/OFF
PROCEDURE: Power ON
1. Turn the power ON.
Press the {Power switch} on the operation panel to turn the power ON.
When the power is turned ON, the power LED turns on. After the leveling automatically has
started, the instrument rotates automatically.
• Avoid a W-LAN connection during auto leveling when setting up the instrument.
• After the rotation starts, do not touch the instrument until it stops at the original position.
Refer to “Auto leveling” on page 18 for information on auto leveling.
• Auto Power OFF function:
If no key operation or no data communication has been performed for about 30 minutes, the power
turns OFF automatically.
• If the power cannot be turned ON even when the battery is mounted or if the power turns OFF as
soon as the power turns ON, it is thought that the battery life is gone. Change it for a fully charged
battery.
“Displaying battery life” on page 11
Procedure: Power OFF
1. Hold down the {Power switch} for about 1 second.
5.3
Setting Up the Instrument
Caution
This instrument automatically operates when the power is turned ON or OFF. Do not
touch the instrument during operation. Doing so may cause injury.