16
2025001032 Revision L, 10/16
5.
Installing Instruments
The instruments that connect to the AIT Table must be mounted and configured properly before
operation. The AIT Table was designed for Topcon instruments. Consequently, adjustments may
be required for other brands of instruments and/or tools.
5.1
General Instrument Installation
1.
Lift and place the diagnostic instruments onto the main tabletop. Adjust the level of
the instrument. Route the power cable down through one of the wire grommets in the
table and if required into the wire channel. Plug into the power strip supplied with
the table or a facility power source.
5.2
Computer System (Where Applicable)
1.
Place the CPU into the CPU bracket assembly (optional) if equipped. Plug into the
power strip supplied with the table or a facility power source.
2.
Place the reduced-size keyboard and mouse on the pivoting keyboard shelf. Pivot the
keyboard by loosening the locking knob (on the underside), and re-tightening it once
in the desired position. Cabling may be routed through the wire channel(s)
underneath the table. Connect all computer-related cables and raise the table to
ensure that enough cable slack is provided to allow a service loop to the CPU. If the
cables are too short, extension cables may be required.
5.3
Power Up
1.
Plug in the power cord, and observe the initial height displayed (inches for 120 VAC
units and cm for 230 VAC units). Refer to the operation section of this document for the
details.
2.
Turn ON all the instruments placed on table. Check the functionality of all the
components. Refer to the documentation supplied with each individual instrument for
operation details.
3.
Once satisfied with the connections of all the instruments, see the next section, SYSTEM
OPERATION, for details using the system.
WARNING: Check all power cords and electrical connections for damage prior to
powering up the system.
!