background image

15

8-MAINTENANCE

 

WARNING: DISCONNECT THE POWER BEFORE SERVICING THE LIFT.

 

IMPORTANT: THE MAINTENANCE INTERVALS INDICATED BELOW APPLY TO 

AVERAGE WORKSHOP USE. THE LIFT SHOULD BE INSPECTED MORE FREQUENTLY 

FOR SEVERE USE APPLICATIONS.

It is important to keep the lift clean, dry, lubricated and well maintained by establishing a periodic 

preventive maintenance program to ensure trouble-free operation and long service life.

1. 

Check safety locking mechanism is functioning correctly.

2.  Check safety lock audibly and visually while in operation.

3. 

Check safety latches for free movement and full engagement with rack.

4.  Inspect the condition of rubber lifting pads and replace as necessary if worn or torn.
5.  Check hydraulic connections, and hoses for leakage.
6.  Check chain connections - Bends, cracks - and looseness.
7.  Check for frayed cables in both raised and lowered positions.
8.  Check snap rings at all rollers and sheaves.
9.  Check bolts, nuts, and screws and tighten.
10. Check wiring & switches for damage.

11. 

Keep base plate free of dirt, grease or any other corrosive substances.

12. Check floor for stress cracks near anchor bolts.

13. 

Check swing arm restraints.

1. 

Check anchor bolts torque to 85 ft-lbs for the 3/4’’ anchor bolts.                                    

NOTE:  DO NOT USE IMPACT WRENCH.

2.  Check floor for stress cracks near anchor bolts.

3.  Check hydraulic oil level.

4.  Check and tighten bolts and nuts, and screws.
5.  Check cylinder pulley assembly for free movement or excessive wear on cylinder yoke or 

pulley pin.

6.  Check cable pulley for free movement and excessive wear.

8.1 MAINTENANCE SCHEDULE

8.1.1 DAILY

8.1.2 WEEKLY

Содержание HD2P-13KCL

Страница 1: ...CHINE WILL FUNCTION CORRECTLY AND PROVIDE MANY YEARS OF DEPENDABLE SERVICE FAILURE TO FOLLOW THESE INSTRUCTIONS AND SAFETY WARNINGS MAY RESULT IN PERSONAL INJURY OR PROPERTY DAMAGE KEEP THIS MANUAL IN...

Страница 2: ...Products May Be Upgraded Without Notice Please Visit WWW TITANLIFTS COM For The Latest Version Of This Manual P O Box 7069 Greenwood IN 46142 Ph 888 908 4826 Fx 317 215 2770 www titanlifts com...

Страница 3: ...distance Titan Lifts or its representatives must approve the pictures before anything can be moved D If any potential liability is determined on behalf of Titan Lifts two estimates must be submitted...

Страница 4: ...CHORING TIP SHEET PAGE 7 6 INSTALLATION INSTRUCTIONS PAGE 8 7 OPERATION INSTRUCTIONS PAGE 12 7 1 DEFECTS MALFUNCTIONS PAGE 12 7 2 CONTROLS PAGE 12 7 2 1 UP CONTROL PAGE 12 7 2 2 SAFETY LOCK CONTROL PA...

Страница 5: ...mended Always lift the vehicle using all four arms Never use the lift to raise one end or one side of vehicle FAILURE TO COMPLY WITH INSTRUCTIONS COULD RESULT IN PROPERTY DAMAGE WARNING READ ENTIRE MA...

Страница 6: ...nd sufficiently lit Vehicle doors should be closed during the raising and lowering cycles Closely watch the vehicle and lift during the raising and lowering cycles Do not operate the lift in explosive...

Страница 7: ...the lift is increased when the vehicle is improperly placed on the platforms when the vehicle s weight or physical dimensions exceed the rated capacity of the lift or when there is excessive movement...

Страница 8: ...nstructions in this manual before operating the lift Proper installation is very important To minimize the chance of making an error in installation please read this manual thoroughly before beginning...

Страница 9: ...straps and parts of the lift be careful the objects do not drop from the package when opening LIFT AND HANDLE ONLY ONE PACKAGE AT A TIME 3 1 DELIVERY AND CHECK OF PACKAGES 3 2 LIFTING AND HANDLING 3 3...

Страница 10: ...IREMENTS 1 Make sure that adequate space and height is available 2 Check for ceiling clearance lifting height plus vehicle height 3 Check for clearance in front and rear of vehicle on lift 4 Check for...

Страница 11: ...top of existing floor Let concrete cure at least 30 days before installing lifts and anchors 5 4 ANCHORING TIP SHEET 1 Use a concrete hammer drill with a carbide tip solid drill bit the same diameter...

Страница 12: ...first safety lock NOTE The power unit column is referred to as the main side column and the non power unit column is referred to as the offside column 6 Once one of the lift columns is positioned usi...

Страница 13: ...s to plumb columns as needed 10 After both columns are properly torqued tighten the 8 crossbar bolts 11 In order to operate both lock latches from the power unit column you will need to install the Sa...

Страница 14: ...electrician make the electrical hookup to the power unit NOTE The electrical test lead that is connected to the motor is strictly for PRELIMINARY LIFT TESTING AND ADJUSTING ONLY Note The power unit mu...

Страница 15: ...ift Raise carriages all the way to the top of the lift then lower carriages down to the ground to bleed air from the hydraulic system prior to adjusting cable tension NOTE Cables must be adjusted so t...

Страница 16: ...ONS SUCH AS JERKY LIFT MOVEMENT OR DEFORMATION OF THE SUPERSTRUCTURE SUPPORT OR LOWER THE LIFT IMMEDIATELY CONTACT QUALIFIED SERVICE PERSONNEL WARNING PAY CLOSE ATTENTION WHEN SETTING THE LOCKS THE LO...

Страница 17: ...he vehicles owner s manual to identify the recommended vehicle lifting points 5 Prepare the work area according to this manual Move the lifting arms inward and position the rubber pads to contact with...

Страница 18: ...safety locks 11 Once the repair work to the vehicle is complete make sure to remove all tools safety jack stands and materials from under the vehicle and lift Also make sure the work area is clear an...

Страница 19: ...or torn 5 Check hydraulic connections and hoses for leakage 6 Check chain connections Bends cracks and looseness 7 Check for frayed cables in both raised and lowered positions 8 Check snap rings at a...

Страница 20: ...operating in harsh or dusty conditions a shorter interval may be required THE FOLLOWING ITEMS SHOULD ONLY BE PERFORMED BY A TRAINED MAINTENANCE EXPERT Replace hydraulic hoses Replace chains and roller...

Страница 21: ...FUNCTIONING CORRECTLY FIG 2 SLIDE TRACKS The carriage assembly slide tracks should be greased every six months or more frequently in case of noise generation Slightly grease the slide tracks over the...

Страница 22: ...ety lock is audibly and visibly operating correctly 4 Check the floor for stress cracks near the anchor bolts 1 Every six months check the nuts of all bolts for correct installation torque 2 Retighten...

Страница 23: ...hums and will not run A Impeller fan cover is dented Take off and straighten B Faulty wiring Call electrician C Bad capacitor Call electrician D Low voltage Call electrician E Lift overloaded Reduce...

Страница 24: ...of energy sources per ANSI Z244 1 1982 before beginning any lift repairs Shall not modify the lift in any manner without prior written consent of the manufacturer Shall display this manual or copy sup...

Страница 25: ...21 FIG 1 HD2P 13KCL 117 50 142 75 151 00 4 72 75 32 45 50 11 DIAGRAMS FIG 1 8...

Страница 26: ...22 FIG 2 HD2P 13KCL Column Anchor Bolts 3 4 6 25 Column 6 Concrete 3000PSI min Torque Nut...

Страница 27: ...7 1 8 1 9 1 10 1 11 1 12 1 13 1 14 1 15 1 Gear Pump Reservoir Reservoir Lid Drain Tube Power Unit for 2 Post lift Manual Release Oil Pickup Tube Oil Filter Throttle Valve Straight Fitting Release Valv...

Страница 28: ...4 5 6 7 7 8 9 9 10 11 14 15 16 17 18 19 20 14 14 14 14 12 4 4 21 22 23 14 14 13 26 25 A 14 14 14 14 26 25 31 B 27 27 27 27 28 28 28 28 28 28 28 28 29 29 29 29 30 30 30 30 C 27 27 27 28 28 28 27 28 29...

Страница 29: ...FIG 5 OFFSIDE COLUMN B A 1A 2 3 4 5 6 7 7 8 9 9 11 20 17 19 18 16 15 14 14 14 14 14 32 14 14 25 26 4 14 14 33 22 4 24 B 27 27 27 27 28 28 28 28 28 28 28 53 29 29 29 29 30 30 30 30 A 14 14 31 14 14 25...

Страница 30: ...FIG 6 CARRIAGE A A 43 43 43 43 43 29 29 54 29 43 29 29 54 35 35 36 36 38 37 37 39A 38A 40 40 40 40 39B 39 7 9 8 9 7 41 41 45 50 42 50 51 52 45 41 41 52 46 49 49 48 48 42 42 42 51 47 47 45 34 45 29 B...

Страница 31: ...27 A B C 53 6 6 6 6 5 5 56 57 55 56 58 5 5 59 59 59 3 59 3 3 3 2 2 2 2 60 15 61 16 A 62 62 62 62 63 63 63 64 64 64 64 63 65 65 65 65 B 60 60 15 15 16 16 61 61 C 60 60 15 15 16 16 61 61 FIG 7 CROSSBEAM...

Страница 32: ...28 FIG 8 CABLES HOSES...

Страница 33: ...7 45 Slide block 1 8 15 Spring washer M6 2 46 Crashproof block 4 16 Flat washer M6 2 47 Hex bolt M8x20 8 17 Shaft assembly of chain 2 48 Spring washer M8 8 18 Copper bush 34x30x50 2 49 Lock washer M8...

Страница 34: ...lic Hose Fitting 9 16 to 9 16 1 110 Nut for cable M16 1 111 Hydraulic Hose 4450mm 1 112 Hydraulic Hose 940mm 1 113 Connector to Cylinder 65mm 2 114 Banjo Bolt 2 115 Combination Seal 2 119 T Fitting 1...

Страница 35: ...31 NOTES...

Страница 36: ...r items such as but not limited to rubber wheel vise pads Titan Bulldog Moto Cradle Wheel Chock is warrantied for replacement parts only to the original purchaser for a period of 2 years from the date...

Страница 37: ...s Titan Lifts product you must register your product with us The simplest way to do this is to visit TITANLIFTS COM WARRANTIES and submit your information online If you prefer to send your information...

Страница 38: ......

Страница 39: ...NOTES...

Страница 40: ...888 908 4826 FAX 317 215 2770 www titanlifts com TITAN MARKETING LLC Copyright 2022 by Titan Marketing LLC All rights reserved No portion of this manual or any artwork contained herein may be reproduc...

Отзывы: