1) After unloading the lift, place it near the intended installation location.
2) Remove the shipping bands and protective wrapping from the lift. Support the top
column as you remove the packing frames from each end of the lift. Be sure to set the
columns down onto a block of wood to avoid any damage.
3)
Remove all loose components from the lift columns and set aside. This
is a good time to install the lock release cable pulley brackets to the top
of the columns and check the contents of the parts box to ensure that
you have all the components needed to complete this install.
4) Once you determine where you want to install the lift, check to make
sure there are no obstructions in the ceiling that may interfere when
standing the columns up. If clear, go ahead and stand the columns up at
his time.
5) Position the columns facing each other 142.75” from the outside of
the base plates; then install the locking system components into each
column (refer to pictures). Be sure to secure the ends of the lock spindle
with the provided C-Clips. Once installed, raise each carriage to the first
safety lock. NOTE: The power unit column is referred to as the main
side column and the non-power unit column is referred to as the offside
column.
6) Once one of the lift columns is positioned, using a 3/4” concrete drill
bit, drill the anchor bolt holes through the baseplate of the column,
installing anchors as you go (see page 8). Thread the nut to the top of
anchor and carefully tap them into the holes drilled into the concrete.
7) Using a level, check column for side-to-side plumb and front-to-back plumb. It is very
important that the columns are perfectly plumb in both directions. Failure to do this
could result in premature wear on the lifting components and/or pad movement while
lifting a vehicle. Use the provided shims to shim the lift column as needed by placing
them around the anchor. Once the column is perfectly plumb, torque 3/4” anchor bolts to
85 ft-lbs. using a torque wrench
NOTE:
DO NOT USE IMPACT WRENCH.
8) You are now ready to install the overhead crossbar. This is also a good time to mount
the brackets for the safety shut-off bar, install the safety shut-off bar itself, and the shut-
off switch, to the underside of the crossbar.
PLEASE NOTE THAT ALL DIMENSIONS GIVEN ARE FOR REFERENCE. FINAL
DIMENSIONS MAY VARY SLIGHTLY. LIFT COLUMNS MUST BE PLUMB AND
SQUARE REGARDLESS OF FINAL DIMENSIONS.
MAIN SIDE
OFFSIDE
Содержание HD2P-13KCL
Страница 25: ...21 FIG 1 HD2P 13KCL 117 50 142 75 151 00 4 72 75 32 45 50 11 DIAGRAMS FIG 1 8...
Страница 26: ...22 FIG 2 HD2P 13KCL Column Anchor Bolts 3 4 6 25 Column 6 Concrete 3000PSI min Torque Nut...
Страница 32: ...28 FIG 8 CABLES HOSES...
Страница 35: ...31 NOTES...
Страница 38: ......
Страница 39: ...NOTES...